Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
525 W PRESIDENT ST
Apply Date:
06/23/2025
Applicant:
Ramon VALDEZ
Description:
Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)

Permit Reviews

Permit Number - TC-MDP-0625-00348
Permit Status: Inspections complete
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Start Date Submittal Complete Date Status  
06/24/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 07/15/2025 REQUIRES RESUBMIT Review Details
07/17/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 07/30/2025 REQUIRES RESUBMIT Review Details
08/25/2025 RESTAMP - RESIDENTIAL v.1 08/25/2025 APPROVED Review Details
08/08/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.3 08/25/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0625-00348
Permit Status: Inspections complete
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Total Outstanding Activity Conditions - 2
Date Name
06/16/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
06/24/2025 A ROW permit shall be obtained from the City of Tucson Department of Transportation and Mobility (DTM) prior to any work within the Public Right-of-Way.

Conditions

Permit Number - TC-MDP-0625-00348
Permit Status: Inspections complete
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Date Description Comments
08/26/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
06/16/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0625-00348
Permite Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
09/02/2025 COT - RSEL - Grounding/Bonding N/A Partial Pass 9.2.2025
Partial pending tie-in to main panel.
12/15/2025 COT - RSBU - Interior Shear Bracing N/A Not Applicable

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0625-00348
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Total Completed Inspections - 18
Date Description Inspector Results Comments
08/28/2025 COT - RSPL - Rough Soil Passed 8.28.2025
Approved, okay to backfill with shading.
08/28/2025 COT - RSPL - Sewer Passed 8.28.2025
Approved, okay to backfill with shading.
08/28/2025 COT - RSPL - Yard Water Line Passed 8.28.2025
Approved, okay to backfill with shading.
09/02/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
09/02/2025 COT - RSBU - Preslab Passed 9.2.2025
Okay for concrete placement.
09/08/2025 COT - RSBU - Roof Nailing Passed 9-8-25: okay to dry-in roof.
09/10/2025 BULD - Electrical Clearance Passed 9.10.2025
Clearance to TEP ECO Unit 1 & 2.
09/10/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 9.10.2025
Corrections made to 9.8.2025 inspection to shot pins and backing. Same day corrections to FHA plates at oven hoods, verified circuit schedule, and sealed top plate penetration.
09/10/2025 COT - RSEL - Grounding/Bonding Passed
09/11/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 9.11.2025
Corrections made to 9.8.2025 inspection. Partial pass pending exterior common firewall on both units.
12/15/2025 COT - RSBU - Firewall/Fire Barrier/Firestop Passed
12/15/2025 COT - RSEL - Electrical Final Passed
12/15/2025 COT - RSEL - Electrical Underground Passed
12/15/2025 COT - RSEL - Outdoor Lighting Passed
12/15/2025 COT - RSME - Mechanical Final Passed
12/15/2025 COT - RSPL - Plumbing Final Passed
12/15/2025 ENGR Engineering Final Passed Site is complete in accordance with approved plans.
12/15/2025 RSBU - Building Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-PRESIDENT_V3.PDF DOCUMENTS VIEW