Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
1111 W HURON ST UNIT 1
Apply Date:
07/02/2025
Applicant:
Ramon VALDEZ
Description:
Duplex SFR & ADU (Model master plan TC-MDP-1224-01416) rev5

Permit Reviews

Permit Number - TC-MDP-0625-00343
Permit Status: Complete
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416) rev5
Start Date Submittal Complete Date Status  
10/17/2025 RESTAMP - RESIDENTIAL v.1 10/20/2025 APPROVED Review Details
10/20/2025 ADMINISTRATIVE v.1 10/20/2025 REQUIRES RESUBMIT Review Details
08/20/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.3 09/04/2025 REQUIRES RESUBMIT Review Details
07/03/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 07/22/2025 REQUIRES RESUBMIT Review Details
10/21/2025 ADMINISTRATIVE v.2 10/21/2025 APPROVED Review Details
09/23/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.5 10/17/2025 APPROVED Review Details
09/05/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.4 09/19/2025 REQUIRES RESUBMIT Review Details
07/28/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 08/18/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-MDP-0625-00343
Permit Status: Complete
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416) rev5
Date Description Comments
10/17/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
06/16/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
06/16/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
07/17/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0625-00343
Permite Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416) rev5
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
01/29/2026 COT - BULD - SWG Clearance N/A Not Applicable
01/29/2026 COT - RSPL - Gas Pressure Test N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0625-00343
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416) rev5
Total Completed Inspections - 19
Date Description Inspector Results Comments
10/24/2025 COT - RSPL - Rough Soil Passed
10/24/2025 COT - RSPL - Sewer Passed
10/24/2025 COT - RSPL - Yard Water Line Passed
10/27/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Passed 10/27/25 ok to pour concrete
10/27/2025 COT - RSBU - Preslab Passed Passed 10/27/25 ok to pour concrete
10/27/2025 COT - RSEL - Grounding/Bonding Passed Partial pass 20/27/25 for ufer only, will check connection at later date
11/17/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
11/17/2025 COT - RSBU - Roof Nailing Passed Ok to dry-in roof system.
11/19/2025 BULD - Electrical Clearance Passed 11.18.25
Grounding verified, labels present, bracing verified. Uffer system. Approved for ECO
11/19/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 11.19.25
Approved, proceed
01/29/2026 COT - RSBU - Interior Shear Bracing Passed
01/29/2026 COT - RSEL - Electrical Final Passed
01/29/2026 COT - RSEL - Electrical Underground Passed
01/29/2026 COT - RSEL - Outdoor Lighting Passed
01/29/2026 COT - RSME - Mechanical Final Passed
01/29/2026 COT - RSPL - Plumbing Final Passed
01/29/2026 ENGR Engineering Final Passed Site is complete in accordance with approved plans.
01/29/2026 RSBU - Building Final Passed
01/29/2026 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL (SSRS).PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-HURON FINAL_V5.PDF DOCUMENTS VIEW