Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
06/06/2025
Applicant:
Jorge Navarro
Description:
Duplex (Model master plan TC-MDP-0724-00807)

Permit Reviews

Permit Number - TC-MDP-0625-00324
Permit Status: Complete
Permit Description: Duplex (Model master plan TC-MDP-0724-00807)
Start Date Submittal Complete Date Status  
09/05/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.3 09/19/2025 REQUIRES RESUBMIT Review Details
12/05/2025 ADMINISTRATIVE v.1 12/05/2025 REQUIRES RESUBMIT Review Details
08/07/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 08/07/2025 REQUIRES RESUBMIT Review Details
11/14/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.5 11/20/2025 APPROVED Review Details
02/18/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/20/2026 APPROVED Review Details
11/05/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.4 11/12/2025 REQUIRES RESUBMIT Review Details
06/10/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 06/26/2025 REQUIRES RESUBMIT Review Details
01/22/2026 SITE FROM MODEL TEMPLATE INFILL BUILDERS REVISION v.1 01/30/2026 APPROVED Review Details
11/20/2025 RESTAMP - RESIDENTIAL v.1 12/08/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0625-00324
Permit Status: Complete
Permit Description: Duplex (Model master plan TC-MDP-0724-00807)
Date Description Comments
06/10/2025 The plan submitted shows to be for a duplex BLDG 6 Units 11 & 12. The location 5740 S Nogales Hy does not have BLDG 6 attached to the address and a pre issuance addressing condition has been placed on permit. Please contact Pima County Addressing at addressing@pima.gov or 520-724-9512 to verify/add the BLDG number. An address change request is required to have the bldg added to this permit. In addition, if the BLDG and units end up different from the ones specified on your site plan and resubmittal may be required as well.
06/03/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
06/03/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
06/24/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0625-00324
Permite Description: Duplex (Model master plan TC-MDP-0724-00807)
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
08/31/2026 COT - RSEL - Electrical Underground N/A Not Applicable
10/05/2026 COT - BULD - SWG Clearance N/A Not Applicable
10/06/2026 COT - RSPL - Gas Pressure Test N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0625-00324
Permit Description: Duplex (Model master plan TC-MDP-0724-00807)
Total Completed Inspections - 19
Date Description Inspector Results Comments
02/12/2026 COT - RSBU - Preslab Passed 02/12/2026
Duplex Unit 11 & 12. Approved per site plan, foundation details. Okay for concrete placement.
02/12/2026 COT - RSBU - Excavation/Rebar/Zoning Passed 02/12/2026
Duplex Unit 11 & 12. Approved per site plan, foundation details. Okay for concrete placement.
03/31/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
04/03/2026 COT - RSBU - Roof Nailing Passed 4/3/26
Inspected and Passed on 31 March 26.
04/10/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 04/10/2026
Approved per plan, Unit 11 & 12 duplex.
05/27/2026 COT - RSEL - Grounding/Bonding Passed 5-27-26: Building 6-grounding/bonding for unit's 11 & 12 approved.
08/31/2026 BULD - Electrical Clearance Passed Passed CLEARANCE ECO
10/06/2026 COT - RSBU - Interior Shear Bracing Passed
10/06/2026 COT - RSEL - Outdoor Lighting Passed
10/06/2026 COT - RSPL - Backwater Valve Passed
10/06/2026 COT - RSPL - Rough Soil Passed
10/06/2026 COT - RSPL - Sewer Passed
10/06/2026 COT - RSPL - Yard Water Line Passed
10/06/2026 RSBU - Building Progress Passed
10/12/2026 COT - RSEL - Electrical Final Passed 10/12/2026
All corrections made.
10/12/2026 COT - RSME - Mechanical Final Passed 0/12/2026
All corrections made.
10/12/2026 RSBU - Building Final Passed 10/12/2026
All corrections made.
10/12/2026 COT - RSPL - Plumbing Final Passed 10/12/2026
All corrections made.
11/10/2026 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL (SSRS).PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO (SSRS).PDF DOCUMENTS VIEW
TRUSS CALCULATION_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
SITE DEVELOPMENT SHEET UNITS 11 - 12 REV_V1.PDF DOCUMENTS VIEW