Permit: TC-MDP-0625-00322
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
5740 S NOGALES HY UNIT 7
Address NEW:
5740 S NOGALES HY UNIT 7
Apply Date:
06/06/2025
Applicant:
Jorge Navarro
Description:
Duplex (Model master plan TC-MDP-0724-00807)
Permit Reviews
Permit Number - TC-MDP-0625-00322
Permit Status: Complete
Permit Description: Duplex (Model master plan TC-MDP-0724-00807)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/05/2025 | ADMINISTRATIVE v.1 | 12/05/2025 | REQUIRES RESUBMIT |
| 02/18/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/20/2026 | APPROVED |
| 09/05/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.3 | 09/19/2025 | REQUIRES RESUBMIT |
| 11/14/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.5 | 11/20/2025 | APPROVED |
| 08/07/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 | 08/07/2025 | REQUIRES RESUBMIT |
| 06/10/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 06/26/2025 | REQUIRES RESUBMIT |
| 11/04/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.4 | 11/10/2025 | REQUIRES RESUBMIT |
| 11/20/2025 | RESTAMP - RESIDENTIAL v.1 | 12/05/2025 | APPROVED |
| 01/22/2026 | SITE FROM MODEL TEMPLATE INFILL BUILDERS REVISION v.1 | 01/30/2026 | APPROVED |
Conditions
Permit Number - TC-MDP-0625-00322
Permit Status: Complete
Permit Description: Duplex (Model master plan TC-MDP-0724-00807)
| Date | Description | Comments |
|---|---|---|
| 06/10/2025 | The plan submitted shows to be for a duplex BLDG 4 Units 7 & 8. The location 5740 S Nogales Hy does not have BLDG 4 attached to the address and a pre issuance addressing condition has been placed on permit. Please contact Pima County Addressing at addressing@pima.gov or 520-724-9512 to verify/add the BLDG number. An address change request is required to have the bldg number added to this permit. In addition, if the BLDG and units end up different from the ones specified on your site plan and resubmittal may be required as well. | |
| 06/03/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 06/03/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 06/24/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0625-00322
Permite Description: Duplex (Model master plan TC-MDP-0724-00807)
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/31/2026 | COT - RSEL - Electrical Underground | N/A | Not Applicable | |
| 09/25/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable | 9/25/26: not applicable. |
| 09/25/2026 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | 9/25/26: not applicable. |
| 10/06/2026 | COT - RSPL - Backwater Valve | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0625-00322
Permit Description: Duplex (Model master plan TC-MDP-0724-00807)
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/09/2026 | COT - RSPL - Rough Soil | Passed | 03/09/2026 Okay to backfill with shading material. |
|
| 03/18/2026 | COT - RSBU - Preslab | Passed | 03/18/2026 Approved per plan. Okay for concrete placement. |
|
| 04/01/2026 | RSBU - Building Progress | Passed | next lift approved 4.1.26 | |
| 04/15/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 04/15/2026 Approved per plan. Added shot pins on interior sill plates 6" from edges at marked locations. |
|
| 04/27/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | O4/27/2026 Verified added foam to top plate penetrations and nail plate to protect DWV pipe. |
|
| 05/27/2026 | COT - RSEL - Grounding/Bonding | Passed | 5-27-26: Building 4-grounding/bonding for unit's 7 & 8 approved. | |
| 06/02/2026 | COT - RSPL - Yard Water Line | Passed | ||
| 08/31/2026 | BULD - Electrical Clearance | Passed | Passed CLEARANCE ECO | |
| 10/06/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 10/06/2026 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 10/06/2026 | COT - RSBU - Masonry Pregrout | Passed | ||
| 10/06/2026 | COT - RSBU - Roof Nailing | Passed | ||
| 10/06/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 10/06/2026 | COT - RSPL - Sewer | Passed | ||
| 10/12/2026 | COT - RSEL - Electrical Final | Passed | 10/12/2026 All corrections made. |
|
| 10/12/2026 | COT - RSPL - Plumbing Final | Passed | 10/12/2026 All corrections made. |
|
| 10/12/2026 | COT - RSME - Mechanical Final | Passed | 10/12/2026 All corrections made. |
|
| 10/12/2026 | RSBU - Building Final | Passed | 10/12/2026 All corrections made. |
|
| 11/10/2026 | ENGR Engineering Final | Passed |