Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0624-00764
Permit Details
Apply Date:
08/15/2024
Applicant:
Dana Petty
Description:
SFR MERI150293 T21-M0067 REV1 roof covering change (Model master plan TC-MDP-0223-00542)
Permit Reviews
Permit Number - TC-MDP-0624-00764
Permit Status: Issued
Permit Description: SFR MERI150293 T21-M0067 REV1 roof covering change (Model master plan TC-MDP-0223-00542)
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/19/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/23/2024 | APPROVED |
01/30/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/31/2025 | APPROVED |
11/15/2024 | SITE FROM MODEL PERMIT - PRODUCTION REVISION v.1 | 11/26/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0624-00764
Permit Status: Issued
Permit Description: SFR MERI150293 T21-M0067 REV1 roof covering change (Model master plan TC-MDP-0223-00542)
Date | Description | Comments |
---|---|---|
08/21/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
08/21/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
01/31/2025 | Post-Installed Anchor Inspection Report is required. | |
08/21/2024 | Post-Tension Inspection Report is required. | |
06/28/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/28/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
08/21/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0624-00764
Permit Description: SFR MERI150293 T21-M0067 REV1 roof covering change (Model master plan TC-MDP-0223-00542)
Total Completed Inspections - 13
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/21/2024 | COT - RSPL - Backwater Valve | Passed | Okay to backfill. Shading required. 11/21/2024 | |
11/21/2024 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 11/21/2024 | |
11/21/2024 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading required. 11/21/2024 | |
11/21/2024 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 11/21/2024 | |
12/04/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, hold downs and masa clips are attached to form as required, post tension cabling is evenly spaced per plan and properly supported off of ground, rebar reinforcement is in place as required per plan, Ufer ground is in place, all underground plumbing pipes are wrapped with foam, and underground electrical is in place for kitchen island. Okay to proceed with concrete pour. | |
12/04/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, hold downs and masa clips are attached to form as required, post tension cabling is evenly spaced per plan and properly supported off of ground, rebar reinforcement is in place as required per plan, Ufer ground is in place, all underground plumbing pipes are wrapped with foam, and underground electrical is in place for kitchen island. Okay to proceed with concrete pour. | |
12/04/2024 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, hold downs and masa clips are attached to form as required, post tension cabling is evenly spaced per plan and properly supported off of ground, rebar reinforcement is in place as required per plan, Ufer ground is in place, all underground plumbing pipes are wrapped with foam, and underground electrical is in place for kitchen island. Okay to proceed with concrete pour. | |
12/23/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
12/23/2024 | COT - RSBU - Roof Nailing | Passed | ||
01/28/2025 | COT - RSEL - Grounding/Bonding | Passed | 1-28-25, grounding/bonding approved | |
01/28/2025 | BULD - Electrical Clearance | Passed | 1-28-25, panel approved to be energized. ECO clearance sent to TEP | |
01/28/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 1-28-25, residential intermediate approved. Okay to continue with construction. | |
01/28/2025 | COT - RSPL - Gas Pressure Test | Passed | 1-28-25, approved |