Permit: TC-MDP-0624-00760
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
10689 E ROSY MARBLE DR
Address NEW:
10689 E ROSY MARBLE DR
Apply Date:
07/01/2024
Applicant:
Dana Petty
Description:
SFR MERI150293 T21-M0067
Permit Reviews
Permit Number - TC-MDP-0624-00760
Permit Status: Complete
Permit Description: SFR MERI150293 T21-M0067
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/02/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 07/02/2024 | APPROVED |
| 01/06/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/07/2025 | APPROVED |
| 09/18/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 09/24/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0624-00760
Permit Status: Complete
Permit Description: SFR MERI150293 T21-M0067
| Date | Description | Comments |
|---|---|---|
| 07/02/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 01/07/2025 | Post-Installed Anchor Inspection Report is required. | |
| 07/02/2024 | Post-Tension Inspection Report is required. | |
| 06/28/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 06/28/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0624-00760
Permite Description: SFR MERI150293 T21-M0067
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/14/2025 | ENGR Engineering Final | N/A | Not Ready | Porta Jons need to be moved All construction materials need to be removed. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0624-00760
Permit Description: SFR MERI150293 T21-M0067
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/15/2024 | COT - RSPL - Rough Soil | Passed | 10/15/24 pass OK to backfill, shading required | |
| 10/15/2024 | COT - RSPL - Sewer | Passed | 10/15/24 PASS. Per schedule with tracer wire | |
| 10/15/2024 | COT - RSPL - Yard Water Line | Passed | Passed, read to backfill, shading required 10/15/24 | |
| 10/22/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 10/22/2024 | COT - RSBU - Preslab | Passed | ||
| 10/22/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 10/22/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 11/08/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Okay to proceed with M, P, & E rough-in. | |
| 11/08/2024 | COT - RSBU - Roof Nailing | Passed | Okay to proceed with M, P, & E rough-in. | |
| 12/19/2024 | COT - RSPL - Gas Pressure Test | Passed | 12-19-24, approved | |
| 12/23/2024 | BULD - Electrical Clearance | Passed | ECO | |
| 12/23/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 01/15/2025 | COT - RSBU - Interior Shear Bracing | Passed | Drywall for interior shear braced walls is properly secured to studs per plan specifications of 4 & 7. Okay to proceed with tape, texture, and painting. | |
| 02/27/2025 | COT - BULD - SWG Clearance | Passed | 2-27-25, SWG clearance inspection approved. Okay for SWG to install service-Clearance issued | |
| 03/14/2025 | COT - RSEL - Electrical Final | Passed | Passed final 3/14/25 CLEARANCE ECO | |
| 03/14/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 3/14/25 | |
| 03/14/2025 | COT - RSME - Mechanical Final | Passed | Passed final 3/14/25 | |
| 03/14/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 3/14/25 | |
| 03/14/2025 | RSBU - Building Final | Passed | Passed final 3/14/25 | |
| 03/14/2025 | RSBU - Building Progress | Passed | Passed final 3/14/25 | |
| 03/24/2025 | ENGR Engineering Final | Passed |