Permit: TC-MDP-0624-00760
Permit Details
Apply Date:
07/01/2024
Applicant:
Daria Hopkins
Description:
SFR MERI150293 T21-M0067
Permit Reviews
Permit Number - TC-MDP-0624-00760
Permit Status: Inspections
Permit Description: SFR MERI150293 T21-M0067
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/02/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 07/02/2024 | APPROVED |
09/18/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 09/24/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0624-00760
Permit Status: Inspections
Permit Description: SFR MERI150293 T21-M0067
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
06/28/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
07/02/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
07/02/2024 | Post-Tension Inspection Report is required. |
Conditions
Permit Number - TC-MDP-0624-00760
Permit Status: Inspections
Permit Description: SFR MERI150293 T21-M0067
Date | Description | Comments |
---|---|---|
06/28/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0624-00760
Permit Description: SFR MERI150293 T21-M0067
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/15/2024 | COT - RSPL - Rough Soil | Passed | 10/15/24 pass OK to backfill, shading required | |
10/15/2024 | COT - RSPL - Sewer | Passed | 10/15/24 PASS. Per schedule with tracer wire | |
10/15/2024 | COT - RSPL - Yard Water Line | Passed | Passed, read to backfill, shading required 10/15/24 | |
10/22/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
10/22/2024 | COT - RSBU - Preslab | Passed | ||
10/22/2024 | COT - RSEL - Electrical Underground | Passed | ||
10/22/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
11/08/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | Okay to proceed with M, P, & E rough-in. | |
11/08/2024 | COT - RSBU - Roof Nailing | Passed | Okay to proceed with M, P, & E rough-in. |