Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/14/2025 | ENGR Engineering Final | Not Ready | Porta Jons need to be moved All construction materials need to be removed. |
|
| 03/18/2025 | ENGR Engineering Final | Not Ready | Water will not drain from the back yard past the air conditioner compressor. Water will not drain from the air conditioner compressor West to the front yard. Grading needs to allow drainage from the back yard to the front. | |
| 03/24/2025 | ENGR Engineering Final | Passed |