Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
08/05/2024
Applicant:
Description:
SFR RKM45R T21-M0093 (REVISION Delta 4)

Permit Reviews

Permit Number - TC-MDP-0624-00740
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
Start Date Submittal Complete Date Status  
08/07/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 08/13/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0624-00740
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
Total Outstanding Activity Conditions - 6
Date Name
06/24/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
08/07/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
08/07/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/07/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/07/2024 Post-Tension Inspection Report is required.
08/07/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Conditions

Permit Number - TC-MDP-0624-00740
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
Date Description Comments
06/24/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
08/07/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0624-00740
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
Total Completed Inspections - 22
Date Description Inspector Results Comments
09/11/2024 COT - RSPL - Yard Water Line Passed 9/11/24: Main water line is connected to meter and trenched to house with blue tracer wire attached. Okay to shade pipe and backfill trench.
09/11/2024 COT - RSPL - Sewer Passed 9/11/24: Underground plumbing is installed and connected to main sewer line. Backwater valve is installed between two clean outs. Entire system is under a water test with no leaks.
09/11/2024 COT - RSPL - Rough Soil Passed 9/11/24: Underground plumbing is installed and connected to main sewer line. Backwater valve is installed between two clean outs. Entire system is under a water test with no leaks.
09/11/2024 COT - RSPL - Backwater Valve Passed 9/11/24: Underground plumbing is installed and connected to main sewer line. Backwater valve is installed between two clean outs. Entire system is under a water test with no leaks.
09/20/2024 COT - RSEL - Grounding/Bonding Passed
09/20/2024 COT - RSBU - Preslab Passed
09/20/2024 COT - RSEL - Electrical Underground Passed
09/20/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
10/21/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 10/21/24: Anchor bolts have been installed, RSP Clips are installed where missing, studs have been added at girders, and H2.5 clips have been installed where missing. Okay to proceed with rough-in of M, P, AND E.
10/21/2024 COT - RSBU - Roof Nailing Passed 10/21/24: Roof sheathing has been properly nailed down. Okay to proceed with rough-in of M, P, AND E.
12/13/2024 BULD - Electrical Clearance Passed 12/13/24 pass TEP clearance code: ECO
12/13/2024 COT - RSPL - Gas Pressure Test Passed pass
12/17/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 12/17/24 corrections were made.
01/03/2025 COT - RSBU - Interior Shear Bracing Passed Passed, ok to tape 1/3/25
02/19/2025 COT - BULD - SWG Clearance Passed 2/19/25 approval for SWG clearance.
03/07/2025 COT - RSME - Mechanical Final Passed 7 March 25
Pass
03/07/2025 ENGR Engineering Final Passed
03/07/2025 COT - RSEL - Outdoor Lighting Passed 7 March 25
Pass
03/07/2025 COT - RSPL - Plumbing Final Passed 7 March 25
Pass
03/07/2025 RSBU - Building Final Passed 7 March 25
Pass
03/07/2025 RSBU - Building Progress Passed
03/07/2025 COT - RSEL - Electrical Final Passed 7 March 25
Pass

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2024-08-05_V1.PDF DOCUMENTS VIEW