Permit: TC-MDP-0624-00735
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
12880 E TORTOISE POINTE DR
Address NEW:
12880 E TORTOISE POINTE DR
Apply Date:
07/18/2024
Applicant:
Brandon Kempel
Description:
SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Permit Reviews
Permit Number - TC-MDP-0624-00735
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/22/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 07/30/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0624-00735
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 06/24/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
| 07/29/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 07/29/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 07/29/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 07/29/2024 | Post-Tension Inspection Report is required. |
| 07/29/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0624-00735
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
| Date | Description | Comments |
|---|---|---|
| 06/24/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 09/27/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0624-00735
Permite Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/16/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 12-16-24, missing fire foam at condensation line, seal all penetrations, nail all h-25's at interior load bearing walls, block register at laundry room, and fix tear to duct in teen room. The window adjacent to the electrical panel is within 3 feet. Per code, a 3 foot clearance is required around panel. |
| 03/20/2025 | RSBU - Building Final | N/A | Re-inspection required | 3-20-25, gfci in garage east wall will not reset, garage receptacle on south wall indicates hot & neutral reversed, no power to exterior outlets, fan in bathroom adjacent to laundry not working. |
| 03/20/2025 | COT - RSEL - Outdoor Lighting | N/A | Re-inspection required | 3-20-25, gfci in garage east wall will not reset, garage receptacle on south wall indicates hot & neutral reversed, no power to exterior outlets, fan in bathroom adjacent to laundry not working. |
| 03/20/2025 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 3-20-25, gfci in garage east wall will not reset, garage receptacle on south wall indicates hot & neutral reversed, no power to exterior outlets, fan in bathroom adjacent to laundry not working. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0624-00735
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/20/2024 | COT - RSPL - Yard Water Line | Passed | 8/20/2024 okay to backfill. Shading required. | |
| 08/20/2024 | COT - RSPL - Sewer | Passed | 8/20/2024 okay to backfill. Shading required. | |
| 08/20/2024 | COT - RSPL - Rough Soil | Passed | 8/20/2024 okay to backfill. Shading required. | |
| 08/20/2024 | COT - RSPL - Backwater Valve | Passed | 8/20/2024 okay to backfill. Shading required. | |
| 09/03/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 09/03/2024 | COT - RSBU - Preslab | Passed | ||
| 09/03/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 09/03/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 10/21/2024 | COT - RSBU - Roof Nailing | Passed | 10/21/24: All items noted on last inspection have been corrected. Okay to proceed with rough-in of M, P, AND E. | |
| 10/21/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 10/21/24: All items noted on last inspection have been corrected. Okay to proceed with rough-in of M, P, AND E. | |
| 12/16/2024 | COT - RSPL - Gas Pressure Test | Passed | 12-16-24, approved. Verified gas at !5 psi. | |
| 12/17/2024 | BULD - Electrical Clearance | Passed | 12/17/24 TEP clearance ECO. | |
| 01/08/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 1/8/25 variance granted by TEP | |
| 01/13/2025 | COT - RSBU - Interior Shear Bracing | Passed | Drywall shear walls are properly secured to the studs per plan requirements. Okay to proceed with tape, texture, and paint | |
| 03/07/2025 | COT - BULD - SWG Clearance | Passed | 7 Mar 25 Southwest Gas Clearance: SWG |
|
| 03/20/2025 | COT - RSPL - Plumbing Final | Passed | 3-20-25, approved | |
| 03/20/2025 | ENGR Engineering Final | Passed | CO Ready Remove dumpster |
|
| 03/20/2025 | COT - RSME - Mechanical Final | Passed | 3-20-25, approved | |
| 03/24/2025 | RSBU - Building Final | Passed | 3-24-25, building final approved. | |
| 03/24/2025 | COT - RSEL - Outdoor Lighting | Passed | 3-24-25, outdoor lighting approved. | |
| 03/24/2025 | RSBU - Building Progress | Passed | ||
| 03/24/2025 | COT - RSEL - Electrical Final | Passed | 3-24-25, electrical final approved. |