Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
06/06/2024
Applicant:
Description:
SFR RKM45M T21-M0092 (Revision 2 structural cals and pages)

Permit Reviews

Permit Number - TC-MDP-0624-00710
Permit Status: Inspections complete
Permit Description: SFR RKM45M T21-M0092 (Revision 2 structural cals and pages)
Start Date Submittal Complete Date Status  
06/07/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 06/10/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0624-00710
Permit Status: Inspections complete
Permit Description: SFR RKM45M T21-M0092 (Revision 2 structural cals and pages)
Total Outstanding Activity Conditions - 6
Date Name
06/06/2024 Post-Tension Inspection Report is required.
06/06/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
06/07/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
06/07/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/07/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/07/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Conditions

Permit Number - TC-MDP-0624-00710
Permit Status: Inspections complete
Permit Description: SFR RKM45M T21-M0092 (Revision 2 structural cals and pages)
Date Description Comments
06/06/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/07/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0624-00710
Permit Description: SFR RKM45M T21-M0092 (Revision 2 structural cals and pages)
Total Completed Inspections - 21
Date Description Inspector Results Comments
07/11/2024 COT - RSPL - Yard Water Line Passed
07/11/2024 COT - RSPL - Sewer Passed
07/11/2024 COT - RSPL - Rough Soil Passed
07/23/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
07/23/2024 COT - RSBU - Preslab Passed
07/23/2024 COT - RSEL - Electrical Underground Passed
07/23/2024 COT - RSEL - Grounding/Bonding Passed
08/14/2024 COT - RSBU - Roof Nailing Passed Roof trusses are properly installed and nailed to top plate, all trusses have H2.5 clips nailed to them. Plywood sheathing is properly secured to roof trusses with nails per plan and code requirements. Okay to proceed with rough-in work.
08/14/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Shear wall hold down are properly secured with nails and interior shear walls are secured with nails and titan bolts to the concrete floor. Plywood sheathing on shear walls are properly secured with nails per plan requirements. Exterior and interior walls are secured to concrete floor with masa clips, titan bolts, j-bolts, or shot pins. All straps are properly placed and secured with nails. Diagonal bracing is properly installed and nailed to each stud. Okay to proceed with rough-in work.
09/17/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO. 9/17/2024
09/20/2024 COT - RSPL - Gas Pressure Test Passed
09/24/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
10/07/2024 COT - RSBU - Interior Shear Bracing Passed Drywall properly secured to studs for interior shear walls per plan. Okay to proceed with tape, texture, and paint.
12/03/2024 COT - BULD - SWG Clearance Passed 12-3-24, approved for Southwest gas connection.
12/10/2024 COT - RSEL - Outdoor Lighting Passed 12-10-24, outdoor lighting approved.
12/13/2024 COT - RSEL - Electrical Final Passed 12/13/24 pass
12/13/2024 COT - RSME - Mechanical Final Passed 12/13/24 pass
12/13/2024 COT - RSPL - Plumbing Final Passed 12/13/24 pass
12/13/2024 ENGR Engineering Final Passed CO Ready
12/13/2024 RSBU - Building Final Passed 12/13/24 pass
12/13/2024 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2024-06-06_V1.PDF DOCUMENTS VIEW