Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Inspection Status: Passed

Inspection History: COT - RSBU - Exterior/Interior Clips/Sheathing/Framing

Permit Number - TC-MDP-0624-00710

Inspection Description - COT - RSBU - Exterior/Interior Clips/Sheathing/Framing

Inspection Status - Passed

Date Description Inspector Results Comments
08/14/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Shear wall hold down are properly secured with nails and interior shear walls are secured with nails and titan bolts to the concrete floor. Plywood sheathing on shear walls are properly secured with nails per plan requirements. Exterior and interior walls are secured to concrete floor with masa clips, titan bolts, j-bolts, or shot pins. All straps are properly placed and secured with nails. Diagonal bracing is properly installed and nailed to each stud. Okay to proceed with rough-in work.