Permit: TC-MDP-0624-00701
Permit Details
Apply Date:
06/03/2024
Applicant:
Cindy Nemo
Description:
Blackhawk - T698 - Layla
Permit Reviews
Permit Number - TC-MDP-0624-00701
Permit Status: Inspections
Permit Description: Blackhawk - T698 - Layla
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/04/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 06/05/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0624-00701
Permit Status: Inspections
Permit Description: Blackhawk - T698 - Layla
Total Outstanding Activity Conditions - 6
Date | Name |
---|---|
06/03/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
06/05/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
06/05/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
06/05/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
06/05/2024 | Post-Tension Inspection Report is required. |
09/25/2023 | Post-Tension Inspection Report is required. |
Conditions
Permit Number - TC-MDP-0624-00701
Permit Status: Inspections
Permit Description: Blackhawk - T698 - Layla
Date | Description | Comments |
---|---|---|
06/03/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/05/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
09/25/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0624-00701
Permite Description: Blackhawk - T698 - Layla
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/26/2024 | RSBU - Building Progress | N/A | Partial Pass | 11-26-24, concrete was previously poured but had to be removed due to an issue with mixture. Therefore, slab was removed and new concrete will be added. All forms/ rebar verified as per approved plans. Okay to pour new slab. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0624-00701
Permit Description: Blackhawk - T698 - Layla
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/23/2024 | COT - RSPL - Rough Soil | Passed | 10-23-24, approved. Okay to backfill. | |
10/23/2024 | COT - RSPL - Sewer | Passed | 10-23-24, sewer connection approved.Okay to backfill. | |
10/23/2024 | COT - RSPL - Backwater Valve | Passed | 10-23-24, approved. Okay to backfill. | |
10/25/2024 | COT - RSPL - Yard Water Line | Passed | 10-25-24, Approved. Okay to backfill. | |
10/30/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 10-30-24, per approved plans. Okay to pour slab. | |
10/30/2024 | COT - RSBU - Preslab | Passed | 10-30-24, per approved plans. Okay to pour slab. | |
10/30/2024 | COT - RSEL - Electrical Underground | Passed | 10-30-24, per approved plans. Okay to pour slab. | |
12/17/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
12/17/2024 | COT - RSBU - Roof Nailing | Passed | Tie downs and framing per plan, roof tight. Ok to proceed 12/17/24 |