Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
6089 E CAMPOLINA TR
Apply Date:
06/03/2024
Applicant:
Brian Jones
Description:
Blackhawk - T698 - Layla

Permit Reviews

Permit Number - TC-MDP-0624-00701
Permit Status: Complete
Permit Description: Blackhawk - T698 - Layla
Start Date Submittal Complete Date Status  
03/06/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/11/2025 REQUIRES RESUBMIT Review Details
08/15/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 08/19/2025 APPROVED Review Details
06/04/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 06/05/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0624-00701
Permit Status: Complete
Permit Description: Blackhawk - T698 - Layla
Date Description Comments
06/05/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
06/05/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/05/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/05/2024 Post-Tension Inspection Report is required.
09/25/2023 Post-Tension Inspection Report is required.
06/03/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/03/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
06/05/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
09/25/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0624-00701
Permite Description: Blackhawk - T698 - Layla
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
01/24/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required 1/24/25:
Seal penetrations on second floor bathroom at bottom plate, seal vapor barrier at second floor by bathroom at south east wall, seal pex at laundry room, leak at first floor bathroom at pex above ceiling, support pex at laundry room, seal penetration through top plate at mast bedroom entrance, wiring size not per plan throughout, missing circuits per panel schedule, loft supply is calling for 7” duct size with 12x12 ceiling diffuser, master bath supply not per plan.
11/26/2024 RSBU - Building Progress N/A Partial Pass 11-26-24, concrete was previously poured but had to be removed due to an issue with mixture. Therefore, slab was removed and new concrete will be added. All forms/ rebar verified as per approved plans. Okay to pour new slab.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0624-00701
Permit Description: Blackhawk - T698 - Layla
Total Completed Inspections - 22
Date Description Inspector Results Comments
10/23/2024 COT - RSPL - Rough Soil Passed 10-23-24, approved. Okay to backfill.
10/23/2024 COT - RSPL - Sewer Passed 10-23-24, sewer connection approved.Okay to backfill.
10/23/2024 COT - RSPL - Backwater Valve Passed 10-23-24, approved. Okay to backfill.
10/25/2024 COT - RSPL - Yard Water Line Passed 10-25-24, Approved. Okay to backfill.
10/30/2024 COT - RSBU - Excavation/Rebar/Zoning Passed 10-30-24, per approved plans. Okay to pour slab.
10/30/2024 COT - RSBU - Preslab Passed 10-30-24, per approved plans. Okay to pour slab.
10/30/2024 COT - RSEL - Electrical Underground Passed 10-30-24, per approved plans. Okay to pour slab.
12/17/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
12/17/2024 COT - RSBU - Roof Nailing Passed Tie downs and framing per plan, roof tight. Ok to proceed 12/17/24
01/24/2025 COT - RSEL - Grounding/Bonding Passed
01/24/2025 COT - RSPL - Gas Pressure Test Passed
01/24/2025 BULD - Electrical Clearance Passed 01/24/25

TEP Clearance: ECO
01/31/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 1/31/25 pass
02/12/2025 COT - RSBU - Interior Shear Bracing Passed Passed interior shear 2/12/25 ok to tape
03/03/2025 RSBU - Building Progress Passed
04/14/2025 COT - BULD - SWG Clearance Passed 04/14/25
SOUTHWEST GAS CLEARANCE: SWG
04/14/2025 COT - RSEL - Outdoor Lighting Passed
04/14/2025 COT - RSPL - Plumbing Final Passed
04/18/2025 COT - RSME - Mechanical Final Passed
04/22/2025 COT - RSEL - Electrical Final Passed 4-22-25, electrical & building final approved.
04/22/2025 RSBU - Building Final Passed 4-22-25, building final approved.
04/22/2025 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL (SSRS).PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BLACKHAWK LOT 40_SIC - 6089 E CAMPOLINA TR-2024-06-03_V1.PDF DOCUMENTS VIEW
BLACKHAWK RANCH LOT 40-START_05.31.24_V1.PDF DOCUMENTS VIEW