Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Permit Number - TC-MDP-0624-00701
Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Inspection Status - Re-inspection required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/24/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 1/24/25: Seal penetrations on second floor bathroom at bottom plate, seal vapor barrier at second floor by bathroom at south east wall, seal pex at laundry room, leak at first floor bathroom at pex above ceiling, support pex at laundry room, seal penetration through top plate at mast bedroom entrance, wiring size not per plan throughout, missing circuits per panel schedule, loft supply is calling for 7” duct size with 12x12 ceiling diffuser, master bath supply not per plan. |
|
01/29/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 1/29/25 partial pass, loft supply in master bath is calling for 7" duct with 12"x12" receptacle . | |
01/31/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 1/31/25 pass |