Permit: TC-MDP-0624-00698
Permit Details
Status:
Issued
Type:
Model Building Permit
Address:
6081 E CAMPOLINA TR
Address NEW:
6081 E CAMPOLINA TR
Apply Date:
06/03/2024
Applicant:
Brian Jones
Description:
Blackhawk - T698 - Layla
Permit Reviews
Permit Number - TC-MDP-0624-00698
Permit Status: Issued
Permit Description: Blackhawk - T698 - Layla
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/04/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 06/05/2024 | APPROVED |
| 07/10/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/10/2024 | APPROVED |
| 09/13/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 09/17/2024 | APPROVED |
| 04/08/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 04/14/2025 | APPROVED |
| 03/06/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/11/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-0624-00698
Permit Status: Issued
Permit Description: Blackhawk - T698 - Layla
| Date | Description | Comments |
|---|---|---|
| 06/05/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 06/05/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 06/05/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 06/05/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 06/05/2024 | Post-Tension Inspection Report is required. | |
| 09/25/2023 | Post-Tension Inspection Report is required. | |
| 06/03/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 06/03/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 06/05/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
| 09/25/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-MDP-0624-00698
Permite Description: Blackhawk - T698 - Layla
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/20/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 12/20/24 h25 at second floor here secondary line I was removed, needs to be replaced, plate guards at mater bathroom on second floor. Wires off of guest plates on second floor. Blocking on register at top of the stairwell by bedroom 3. foam gaps in floor and my penetrations between floors. PEX line by main entrance may have penetrations from when lathe was installed. Vent line on east back wall needs to be filled surrounding the base. Re inspection required. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0624-00698
Permit Description: Blackhawk - T698 - Layla
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/18/2024 | COT - RSPL - Backwater Valve | Passed | 10/18/24: plumbing underground per plan ok to proceed with backfill, shading required | |
| 10/18/2024 | COT - RSPL - Sewer | Passed | 10/18/24: plumbing underground per plan ok to proceed with backfill, shading required | |
| 10/18/2024 | COT - RSPL - Yard Water Line | Passed | 10/18/24: plumbing underground per plan ok to proceed with backfill, shading required | |
| 10/18/2024 | COT - RSPL - Rough Soil | Passed | 10/18/24: plumbing underground per plan ok to proceed with backfill, shading required | |
| 10/25/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 10-25-24, approved. Setbacks verified. | |
| 10/25/2024 | COT - RSBU - Preslab | Passed | 10-25-24, preslab approved. Okay to pour. | |
| 10/25/2024 | COT - RSEL - Electrical Underground | Passed | 10-25-24, approved. | |
| 11/08/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Passed | |
| 11/08/2024 | COT - RSBU - Roof Nailing | Passed | Passed | |
| 12/20/2024 | BULD - Electrical Clearance | Passed | 12/20/24 TEP clearance code: ECO | |
| 12/20/2024 | COT - RSEL - Grounding/Bonding | Passed | 12/20/24 pass. | |
| 12/20/2024 | COT - RSPL - Gas Pressure Test | Passed | 12/20/24 pass | |
| 12/30/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 12/30/24 corrections made | |
| 01/28/2025 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 02/06/2025 | RSBU - Building Progress | Passed | mesh and rebar present at entry, ok to pour concrete 2/6/25 | |
| 03/19/2025 | RSBU - Building Final | Passed | ||
| 03/19/2025 | COT - BULD - SWG Clearance | Passed | 18 March 25 SOUTHWEST GAS CLEARANCE: SWG |
|
| 03/19/2025 | COT - RSEL - Electrical Final | Passed | ||
| 03/19/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 03/19/2025 | COT - RSME - Mechanical Final | Passed | ||
| 03/19/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 03/26/2025 | ENGR Engineering Final | Passed | CO Ready |