Permit: TC-MDP-0624-00690
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
6757 E PASEO DON OCTAVIO
Address NEW:
6757 E PASEO DON OCTAVIO
Apply Date:
06/10/2024
Applicant:
Dana Petty
Description:
SFR 130.1600 T21-M0030
Permit Reviews
Permit Number - TC-MDP-0624-00690
Permit Status: Complete
Permit Description: SFR 130.1600 T21-M0030
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/11/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 06/18/2024 | APPROVED |
| 12/05/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/06/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0624-00690
Permit Status: Complete
Permit Description: SFR 130.1600 T21-M0030
| Date | Description | Comments |
|---|---|---|
| 06/18/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 06/18/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 06/18/2024 | Post-Tension Inspection Report is required. | |
| 06/03/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 06/03/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 06/18/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0624-00690
Permit Description: SFR 130.1600 T21-M0030
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/23/2024 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading is required. 9/23/2024 | |
| 09/23/2024 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading is required. 9/23/2024 | |
| 09/27/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 09/27/2024 | COT - RSBU - Preslab | Passed | ||
| 09/27/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 09/27/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 10/04/2024 | COT - RSPL - Yard Water Line | Passed | PASS. corrections have been made. 10/4/2024 | |
| 10/14/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 10/16/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Corrections were made. 10/16/2024 | |
| 10/30/2024 | BULD - Electrical Clearance | Passed | 10-30-24, electrical panel approved for power. | |
| 10/30/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 10-30-24, all,items from previous inspection were corrected. Intermediate inspection approved. Okay to continue with construction. | |
| 10/30/2024 | COT - RSPL - Gas Pressure Test | Passed | 10-30-24, gas pressure test approved. | |
| 11/14/2024 | COT - RSBU - Interior Shear Bracing | Passed | 11-14-24, okay to tape & texture drywall. | |
| 01/09/2025 | COT - BULD - SWG Clearance | Passed | PASSED SWG CLEARANCE 1/9/25 | |
| 01/14/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed 1/14/25 | |
| 01/16/2025 | COT - RSEL - Electrical Final | Passed | 1/16/25 corrections made | |
| 01/16/2025 | COT - RSME - Mechanical Final | Passed | 1/16/25 corrections made | |
| 01/16/2025 | COT - RSPL - Plumbing Final | Passed | 1/16/25 corrections made | |
| 01/16/2025 | ENGR Engineering Final | Passed | CO ready | |
| 01/16/2025 | RSBU - Building Final | Passed | 1/16/25 corrections made | |
| 01/16/2025 | RSBU - Building Progress | Passed | 1/16/25 corrections made |