Permit: TC-MDP-0624-00690
Permit Details
Apply Date:
06/10/2024
Applicant:
Dana Petty
Description:
SFR 130.1600 T21-M0030
Permit Reviews
Permit Number - TC-MDP-0624-00690
Permit Status: Inspections
Permit Description: SFR 130.1600 T21-M0030
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/11/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 06/18/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0624-00690
Permit Status: Inspections
Permit Description: SFR 130.1600 T21-M0030
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
06/03/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
06/18/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
06/18/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
06/18/2024 | Post-Tension Inspection Report is required. |
Conditions
Permit Number - TC-MDP-0624-00690
Permit Status: Inspections
Permit Description: SFR 130.1600 T21-M0030
Date | Description | Comments |
---|---|---|
06/03/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/18/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0624-00690
Permit Description: SFR 130.1600 T21-M0030
Total Completed Inspections - 7
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/23/2024 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading is required. 9/23/2024 | |
09/23/2024 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading is required. 9/23/2024 | |
09/27/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
09/27/2024 | COT - RSBU - Preslab | Passed | ||
09/27/2024 | COT - RSEL - Electrical Underground | Passed | ||
09/27/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
10/04/2024 | COT - RSPL - Yard Water Line | Passed | PASS. corrections have been made. 10/4/2024 |