Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
08/09/2023
Applicant:
Andrea Flood
Description:
SFR F40F22 T22-M0026

Permit Reviews

Permit Number - TC-MDP-0623-01192
Permit Status: Inspections complete
Permit Description: SFR F40F22 T22-M0026
Start Date Submittal Complete Date Status  
08/09/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 08/11/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0623-01192
Permit Status: Inspections complete
Permit Description: SFR F40F22 T22-M0026
Total Outstanding Activity Conditions - 6
Date Name
07/20/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
08/09/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
08/09/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/09/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/09/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
08/11/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0623-01192
Permit Status: Inspections complete
Permit Description: SFR F40F22 T22-M0026
Date Description Comments
06/27/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/20/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0623-01192
Permit Description: SFR F40F22 T22-M0026
Total Completed Inspections - 21
Date Description Inspector Results Comments
09/21/2023 COT - RSPL - Sewer Passed
09/22/2023 COT - RSPL - Rough Soil Passed
09/29/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
09/29/2023 COT - RSBU - Preslab Passed
09/29/2023 COT - RSEL - Grounding/Bonding Passed
09/29/2023 COT - RSEL - Electrical Underground Passed
11/29/2023 COT - RSPL - Yard Water Line Passed
12/22/2023 BULD - Electrical Clearance Passed ECO Clearance issued to TEP. Okay to be energized.
12/22/2023 COT - RSBU - Exterior Clips/Sheathing Passed Contractor has a letter from roofing subcontractor on roof. Will be scanning it into the portal.
12/22/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with insulation and drywall installation.
12/22/2023 COT - RSBU - Roof Nailing Passed 12/21/23: Contractor has a letter from roofing subcontractor on roof. Will be scanning it into the portal.
12/22/2023 COT - RSPL - Gas Pressure Test Passed Gas line is holding 15# of air pressure, with no leaks.
02/02/2024 COT - RSBU - Interior Shear Bracing Passed
03/14/2024 COT - BULD - SWG Clearance Passed
04/26/2024 COT - RSEL - Electrical Final Passed Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. GFCI outlets are installed in bathrooms, garage, outside receptacles, laundry room, and kitchen. AFCI breakers are installed for bedrooms, living room, den, and dining room. Return and supply registers are installed. Okay to issue Certificate of Occupancy for this project and permit.
04/26/2024 COT - RSEL - Outdoor Lighting Passed Outdoor lighting is installed per plans and fully operational.
04/26/2024 COT - RSME - Mechanical Final Passed Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. GFCI outlets are installed in bathrooms, garage, outside receptacles, laundry room, and kitchen. AFCI breakers are installed for bedrooms, living room, den, and dining room. Return and supply registers are installed. Okay to issue Certificate of Occupancy for this project and permit.
04/26/2024 COT - RSPL - Plumbing Final Passed Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. GFCI outlets are installed in bathrooms, garage, outside receptacles, laundry room, and kitchen. AFCI breakers are installed for bedrooms, living room, den, and dining room. Return and supply registers are installed. Okay to issue Certificate of Occupancy for this project and permit.
04/26/2024 RSBU - Building Final Passed Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. GFCI outlets are installed in bathrooms, garage, outside receptacles, laundry room, and kitchen. AFCI breakers are installed for bedrooms, living room, den, and dining room. Return and supply registers are installed. Okay to issue Certificate of Occupancy for this project and permit.
04/26/2024 RSBU - Building Progress Passed Complete.
04/26/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-08-09_V1.PDF DOCUMENTS VIEW