Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Roof Nailing 

Permit Number - TC-MDP-0623-01192

Inspection Description - COT - RSBU - Roof Nailing 

Inspection Status - Re-inspection required

Date Description Inspector Results Comments
11/29/2023 COT - RSBU - Roof Nailing  Re-inspection required 11/29/23: This roof was dried in and loaded with roof tile before the roof was inspected and approved by the City of Tucson inspector. The framing contractor of record is hereby instructed to provide a statement on company letterhead that this roof sheathing complies fully with R803 2018 IRC.
12/22/2023 COT - RSBU - Roof Nailing  Passed 12/21/23: Contractor has a letter from roofing subcontractor on roof. Will be scanning it into the portal.