Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
06/23/2023
Applicant:
Andrea Flood
Description:
SFR F40F22 T22-M0026

Permit Reviews

Permit Number - TC-MDP-0623-01189
Permit Status: Complete
Permit Description: SFR F40F22 T22-M0026
Start Date Submittal Complete Date Status  
09/28/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/03/2023 APPROVED Review Details
06/27/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 06/28/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0623-01189
Permit Status: Complete
Permit Description: SFR F40F22 T22-M0026
Date Description Comments
06/28/2023 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
06/27/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
06/27/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/27/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/29/2023 Post-Tension Inspection Report is required.
06/27/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
09/29/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
06/27/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
06/28/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0623-01189
Permite Description: SFR F40F22 T22-M0026
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
COT - RSPL - Gas Pressure Test N/A Requested
COT - RSPL - Yard Water Line N/A Requested
09/25/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required Missing anchors at shear walls, add more nails to sole plates.

Partial pending truss repair towards front garage. 8/23/2023.
9/25/23: provide copy of truss repair, staple 2nd copy to the area of repair, send 3rd copy into portal.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0623-01189
Permit Description: SFR F40F22 T22-M0026
Total Completed Inspections - 20
Date Description Inspector Results Comments
07/26/2023 COT - RSPL - Rough Soil Passed
07/26/2023 COT - RSPL - Sewer Passed
07/26/2023 COT - RSPL - Backwater Valve Passed
07/31/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
07/31/2023 COT - RSBU - Preslab Passed
07/31/2023 COT - RSEL - Electrical Underground Passed
07/31/2023 COT - RSEL - Grounding/Bonding Passed
08/22/2023 COT - RSBU - Roof Nailing Passed
09/25/2023 BULD - Electrical Clearance Passed TEP ECO
09/27/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
10/10/2023 COT - RSBU - Interior Shear Bracing Passed
12/06/2023 COT - BULD - SWG Clearance Passed SWG clearance issued.
12/06/2023 COT - RSBU - Exterior Clips/Sheathing Passed
01/08/2024 COT - RSEL - Electrical Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures. GFCI outlets are installed in kitchen, bathrooms, & garage. Electrical panel is properly labeled.
01/08/2024 COT - RSEL - Outdoor Lighting Passed Exterior lights match was called out on plans and are fully operational.
01/08/2024 COT - RSME - Mechanical Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures. GFCI outlets are installed in kitchen, bathrooms, & garage. Electrical panel is properly labeled.
01/08/2024 COT - RSPL - Plumbing Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures. GFCI outlets are installed in kitchen, bathrooms, & garage. Electrical panel is properly labeled.
01/08/2024 RSBU - Building Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures. GFCI outlets are installed in kitchen, bathrooms, & garage. Electrical panel is properly labeled.
01/08/2024 RSBU - Building Progress Passed Construction is complete. Mechanical, electrical, and plumbing fixtures. GFCI outlets are installed in kitchen, bathrooms, & garage. Electrical panel is properly labeled.
01/08/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
152455 SAGUARO TRAILS PT REPORT LOT 3224-2023-09-28_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-06-27_V1.PDF DOCUMENTS VIEW