Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Model Building Permit
Apply Date:
01/02/2025
Applicant:
Celina Rodriguez
Description:
SFR BT2010-30 T22-M0010 (Model master plan TC-MDP-0623-01161)

Permit Reviews

Permit Number - TC-MDP-0623-01173
Permit Status: Inspections
Permit Description: SFR BT2010-30 T22-M0010 (Model master plan TC-MDP-0623-01161)
Start Date Submittal Complete Date Status  
01/14/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 01/22/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0623-01173
Permit Status: Inspections
Permit Description: SFR BT2010-30 T22-M0010 (Model master plan TC-MDP-0623-01161)
Total Outstanding Activity Conditions - 5
Date Name
01/14/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
01/15/2025 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
01/15/2025 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/15/2025 Post-Installed Anchor Inspection Report is required.
01/15/2025 Post-Tension Inspection Report is required.

Conditions

Permit Number - TC-MDP-0623-01173
Permit Status: Inspections
Permit Description: SFR BT2010-30 T22-M0010 (Model master plan TC-MDP-0623-01161)
Date Description Comments
01/14/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
06/22/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0623-01173
Permite Description: SFR BT2010-30 T22-M0010 (Model master plan TC-MDP-0623-01161)
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
03/11/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required 1. Bang plates needed throughout.
2. Vent on West wall second floor bathroom needs Boca plate on sill and on top plate, also needs to be sealed/flashed through roof.
3. Pancake box in master bathroom above sink is overloaded.
4. Attic light switch needs to be facing attic access, current location is hard to find in the dark.
5. Return air flex for bedroom 3 is not attached to Air handler.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0623-01173
Permit Description: SFR BT2010-30 T22-M0010 (Model master plan TC-MDP-0623-01161)
Total Completed Inspections - 11
Date Description Inspector Results Comments
01/24/2025 COT - RSPL - Sewer Passed 1/24/25 pass
01/24/2025 COT - RSPL - Rough Soil Passed 1/24/25 pass
01/24/2025 COT - RSPL - Yard Water Line Passed 1/24/25 pass
02/04/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 2/4/25 passed, rebar and hold downs per plan, ok to pour concrete
02/04/2025 COT - RSEL - Electrical Underground Passed 2/4/25 passed, rebar and hold downs per plan, ok to pour concrete
02/04/2025 COT - RSBU - Preslab Passed 2/4/25 passed, rebar and hold downs per plan, ok to pour concrete
02/04/2025 COT - RSEL - Grounding/Bonding Passed 2/4/25 passed, rebar and hold downs per plan, ok to pour concrete
02/04/2025 COT - RSPL - Backwater Valve Passed 2/4/25 passed
02/20/2025 COT - RSBU - Roof Nailing Passed 2/19/25 pass
02/21/2025 COT - RSBU - Exterior Clips/Sheathing Passed 2/21/25: Brackets have been installed on stairwell landing floor joists, upstairs shear walls has been properly secured to studs, and bottom plate is properly nailed off. Okay to proceed with rough-in of mechanical, electrical, and plumbing.
03/11/2025 COT - RSPL - Gas Pressure Test Passed

Scheduled Inspections

Scheduled Inspections - TC-MDP-0623-01173
Status: Inspections
Description: SFR BT2010-30 T22-M0010 (Model master plan TC-MDP-0623-01161)

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 3 - LOT 63 START_V1.PDF DOCUMENTS VIEW
BTIII 63 SIC-2025-01-02_V1.PDF DOCUMENTS VIEW