Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
06/16/2023
Applicant:
Daria Hopkins
Description:
SFR 235.2580 T21-M0051

Permit Reviews

Permit Number - TC-MDP-0623-01159
Permit Status: Complete
Permit Description: SFR 235.2580 T21-M0051
Start Date Submittal Complete Date Status  
06/16/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 06/20/2023 APPROVED Review Details
06/14/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/17/2024 APPROVED Review Details
09/27/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/27/2023 APPROVED Review Details
04/29/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 05/06/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0623-01159
Permit Status: Complete
Permit Description: SFR 235.2580 T21-M0051
Date Description Comments
06/17/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
06/16/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/16/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/27/2023 Post-Tension Inspection Report is required.
06/13/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/16/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
06/16/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0623-01159
Permite Description: SFR 235.2580 T21-M0051
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
06/03/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required 6/3/24: ground screw missing throughout at metallic fixtures, truss bearing/shear transfer detail missing at entrance per plan (SD-2/1B), all penetrations going through top plate need to be sealed, all penetrations going through vapor barrier must be sealed, nail plate missing throughout at plumbing and electrical, seal all penetrations through second floor decking, PV conduit must be stubbed through roof, properly secure flex duct, properly support PV conduit midway, properly seal chase upstairs, properly secure electrical at boxes, cleanout missing at second floor bathroom in master,
06/03/2024 COT - RSPL - Gas Pressure Test N/A Re-inspection required 6/3/24: ground screw missing throughout at metallic fixtures, truss bearing/shear transfer detail missing at entrance per plan (SD-2/1B), all penetrations going through top plate need to be sealed, all penetrations going through vapor barrier must be sealed, nail plate missing throughout at plumbing and electrical, seal all penetrations through second floor decking, PV conduit must be stubbed through roof, properly secure flex duct, properly support PV conduit midway, properly seal chase upstairs, properly secure electrical at boxes, cleanout missing at second floor bathroom in master,

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0623-01159
Permit Description: SFR 235.2580 T21-M0051
Total Completed Inspections - 21
Date Description Inspector Results Comments
04/16/2024 COT - RSPL - Yard Water Line Passed
04/16/2024 COT - RSPL - Rough Soil Passed
04/16/2024 COT - RSPL - Sewer Passed
04/23/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
04/23/2024 COT - RSBU - Preslab Passed
04/23/2024 COT - RSEL - Grounding/Bonding Passed
04/23/2024 COT - RSEL - Electrical Underground Passed
05/08/2024 COT - RSBU - Roof Nailing Passed
05/14/2024 COT - RSBU - Exterior Clips/Sheathing Passed
05/23/2024 BULD - Electrical Clearance Passed
06/05/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
06/05/2024 COT - RSPL - Gas Pressure Test Passed
06/21/2024 COT - RSBU - Interior Shear Bracing Passed
08/02/2024 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 8/2/2024
08/16/2024 RSBU - Building Progress Passed
08/22/2024 COT - RSEL - Outdoor Lighting Passed
08/27/2024 COT - RSEL - Electrical Final Passed Corrections were made. 8/27/2024
08/27/2024 COT - RSME - Mechanical Final Passed Corrections were made. 8/27/2024
08/27/2024 COT - RSPL - Plumbing Final Passed Corrections were made. 8/27/2024
08/27/2024 ENGR Engineering Final Passed Move in ready
08/27/2024 RSBU - Building Final Passed Corrections were made. 8/27/2024

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
147154 PT LOT 63 COMPLETE-2024-06-11_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 63 PLOT PLAN REV1_V1.PDF DOCUMENTS VIEW
TC-MDP-0623-01159 REVISION 4.29.24_V1.PDF DOCUMENTS VIEW
LOT 63 SPECIAL INSPECTION CERTIFICATE-2023-09-27_V1.PDF DOCUMENTS VIEW
PATTISON SIC LETTER 9.27.23_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 63 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 63 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 63 SPECIAL INSPECTION CERTIFICATE-2023-06-16_V1.PDF DOCUMENTS VIEW