Permit: TC-MDP-0623-01159
Permit Details
Apply Date:
06/16/2023
Applicant:
Daria Hopkins
Description:
SFR 235.2580 T21-M0051
Permit Reviews
Permit Number - TC-MDP-0623-01159
Permit Status: Complete
Permit Description: SFR 235.2580 T21-M0051
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/16/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 06/20/2023 | APPROVED |
06/14/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/17/2024 | APPROVED |
09/27/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/27/2023 | APPROVED |
04/29/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 05/06/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0623-01159
Permit Status: Complete
Permit Description: SFR 235.2580 T21-M0051
Date | Description | Comments |
---|---|---|
06/17/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
06/16/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
06/16/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
09/27/2023 | Post-Tension Inspection Report is required. | |
06/13/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/16/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
06/16/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0623-01159
Permite Description: SFR 235.2580 T21-M0051
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/03/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 6/3/24: ground screw missing throughout at metallic fixtures, truss bearing/shear transfer detail missing at entrance per plan (SD-2/1B), all penetrations going through top plate need to be sealed, all penetrations going through vapor barrier must be sealed, nail plate missing throughout at plumbing and electrical, seal all penetrations through second floor decking, PV conduit must be stubbed through roof, properly secure flex duct, properly support PV conduit midway, properly seal chase upstairs, properly secure electrical at boxes, cleanout missing at second floor bathroom in master, |
06/03/2024 | COT - RSPL - Gas Pressure Test | N/A | Re-inspection required | 6/3/24: ground screw missing throughout at metallic fixtures, truss bearing/shear transfer detail missing at entrance per plan (SD-2/1B), all penetrations going through top plate need to be sealed, all penetrations going through vapor barrier must be sealed, nail plate missing throughout at plumbing and electrical, seal all penetrations through second floor decking, PV conduit must be stubbed through roof, properly secure flex duct, properly support PV conduit midway, properly seal chase upstairs, properly secure electrical at boxes, cleanout missing at second floor bathroom in master, |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0623-01159
Permit Description: SFR 235.2580 T21-M0051
Total Completed Inspections - 21