Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
08/10/2023
Applicant:
Daria Hopkins
Description:
SFR MERI213021 T21-M0065

Permit Reviews

Permit Number - TC-MDP-0623-01149
Permit Status: Complete
Permit Description: SFR MERI213021 T21-M0065
Start Date Submittal Complete Date Status  
09/16/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/17/2024 APPROVED Review Details
08/11/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 08/15/2023 APPROVED Review Details
10/02/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/02/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0623-01149
Permit Status: Complete
Permit Description: SFR MERI213021 T21-M0065
Date Description Comments
10/02/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
08/11/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/11/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/14/2023 Post-Tension Inspection Report is required.
06/09/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
09/17/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
08/11/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
08/14/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0623-01149
Permit Description: SFR MERI213021 T21-M0065
Total Completed Inspections - 22
Date Description Inspector Results Comments
10/19/2023 BULD - Electrical Clearance Passed
02/13/2024 COT - RSBU - Interior Shear Bracing Passed
10/31/2023 COT - RSPL - Backwater Valve Passed
10/31/2023 COT - RSPL - Rough Soil Passed
10/31/2023 COT - RSPL - Sewer Passed
11/08/2023 COT - RSBU - Preslab Passed Rebar reinforcement is in place per plans, post tension cabling is installed and properly supported off of ground, Ufer ground is in place and the proper length, underground electrical for kitchen island is properly installed, plumbing pipes are properly wrapped with styrofoam sheeting, and subsoil is properly compacted. Okay to pour concrete for slab on grade.
11/08/2023 COT - RSBU - Excavation/Rebar/Zoning Passed Rebar reinforcement is in place per plans, post tension cabling is installed and properly supported off of ground, Ufer ground is in place and the proper length, underground electrical for kitchen island is properly installed, plumbing pipes are properly wrapped with styrofoam sheeting, and subsoil is properly compacted. Okay to pour concrete for slab on grade.
11/08/2023 COT - RSEL - Electrical Underground Passed Rebar reinforcement is in place per plans, post tension cabling is installed and properly supported off of ground, Ufer ground is in place and the proper length, underground electrical for kitchen island is properly installed, plumbing pipes are properly wrapped with styrofoam sheeting, and subsoil is properly compacted. Okay to pour concrete for slab on grade.
11/08/2023 COT - RSEL - Grounding/Bonding Passed Rebar reinforcement is in place per plans, post tension cabling is installed and properly supported off of ground, Ufer ground is in place and the proper length, underground electrical for kitchen island is properly installed, plumbing pipes are properly wrapped with styrofoam sheeting, and subsoil is properly compacted. Okay to pour concrete for slab on grade.
12/08/2023 COT - RSBU - Exterior Clips/Sheathing Passed
12/08/2023 COT - RSPL - Yard Water Line Passed leak at main
12/08/2023 COT - RSBU - Roof Nailing Passed
01/31/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 1/31/24: Bath tubs are installed and under water test.
04/05/2024 COT - BULD - SWG Clearance Passed
04/17/2024 COT - RSEL - Electrical Final Passed
04/17/2024 COT - RSEL - Outdoor Lighting Passed
04/17/2024 COT - RSME - Mechanical Final Passed
04/17/2024 COT - RSPL - Gas Pressure Test Passed
04/17/2024 COT - RSPL - Plumbing Final Passed
04/17/2024 RSBU - Building Progress Passed
04/18/2024 RSBU - Building Final Passed
04/18/2024 ENGR Engineering Final Passed Thank you for taking care of this.

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
143755 PT LOT 67 COMPLETE-2024-09-13_V1.PDF DOCUMENTS VIEW
LOT 67 SPECIAL INSPECTION CERTIFICATE-2023-09-29_V1.PDF DOCUMENTS VIEW
PATTISON SIC LETTER 9.27.23_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 67 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 67 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 67 SPECIAL INSPECTION CERTIFICATE-2023-08-10_V1.PDF DOCUMENTS VIEW