Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0623-01149
Permit Details
Apply Date:
08/10/2023
Applicant:
Daria Hopkins
Description:
SFR MERI213021 T21-M0065
Permit Reviews
Permit Number - TC-MDP-0623-01149
Permit Status: Complete
Permit Description: SFR MERI213021 T21-M0065
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/16/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/17/2024 | APPROVED |
08/11/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/15/2023 | APPROVED |
10/02/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/02/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-0623-01149
Permit Status: Complete
Permit Description: SFR MERI213021 T21-M0065
Date | Description | Comments |
---|---|---|
10/02/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
08/11/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
08/11/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
08/14/2023 | Post-Tension Inspection Report is required. | |
06/09/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
09/17/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
08/11/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
08/14/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0623-01149
Permit Description: SFR MERI213021 T21-M0065
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/19/2023 | BULD - Electrical Clearance | Passed | ||
02/13/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
10/31/2023 | COT - RSPL - Backwater Valve | Passed | ||
10/31/2023 | COT - RSPL - Rough Soil | Passed | ||
10/31/2023 | COT - RSPL - Sewer | Passed | ||
11/08/2023 | COT - RSBU - Preslab | Passed | Rebar reinforcement is in place per plans, post tension cabling is installed and properly supported off of ground, Ufer ground is in place and the proper length, underground electrical for kitchen island is properly installed, plumbing pipes are properly wrapped with styrofoam sheeting, and subsoil is properly compacted. Okay to pour concrete for slab on grade. | |
11/08/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Rebar reinforcement is in place per plans, post tension cabling is installed and properly supported off of ground, Ufer ground is in place and the proper length, underground electrical for kitchen island is properly installed, plumbing pipes are properly wrapped with styrofoam sheeting, and subsoil is properly compacted. Okay to pour concrete for slab on grade. | |
11/08/2023 | COT - RSEL - Electrical Underground | Passed | Rebar reinforcement is in place per plans, post tension cabling is installed and properly supported off of ground, Ufer ground is in place and the proper length, underground electrical for kitchen island is properly installed, plumbing pipes are properly wrapped with styrofoam sheeting, and subsoil is properly compacted. Okay to pour concrete for slab on grade. | |
11/08/2023 | COT - RSEL - Grounding/Bonding | Passed | Rebar reinforcement is in place per plans, post tension cabling is installed and properly supported off of ground, Ufer ground is in place and the proper length, underground electrical for kitchen island is properly installed, plumbing pipes are properly wrapped with styrofoam sheeting, and subsoil is properly compacted. Okay to pour concrete for slab on grade. | |
12/08/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
12/08/2023 | COT - RSPL - Yard Water Line | Passed | leak at main | |
12/08/2023 | COT - RSBU - Roof Nailing | Passed | ||
01/31/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 1/31/24: Bath tubs are installed and under water test. | |
04/05/2024 | COT - BULD - SWG Clearance | Passed | ||
04/17/2024 | COT - RSEL - Electrical Final | Passed | ||
04/17/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
04/17/2024 | COT - RSME - Mechanical Final | Passed | ||
04/17/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
04/17/2024 | COT - RSPL - Plumbing Final | Passed | ||
04/17/2024 | RSBU - Building Progress | Passed | ||
04/18/2024 | RSBU - Building Final | Passed | ||
04/18/2024 | ENGR Engineering Final | Passed | Thank you for taking care of this. |