SFR 230.2380 T21-M0028

Permit Reviews

Permit Number - TC-MDP-0623-01143
Permit Status: Complete
Permit Description: SFR 230.2380 T21-M0028
Start Date Submittal Complete Date Status  
08/19/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/21/2024 APPROVED Review Details
06/14/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 06/15/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0623-01143
Permit Status: Complete
Permit Description: SFR 230.2380 T21-M0028
Date Description Comments
06/14/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/14/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/09/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
08/20/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
06/14/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
06/15/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0623-01143
Permit Description: SFR 230.2380 T21-M0028
Total Completed Inspections - 21
Date Description Inspector Results Comments
08/30/2023 COT - RSPL - Rough Soil Passed 8/30/23: ok to backfill
08/30/2023 COT - RSPL - Yard Water Line Passed 8/30/23: ok to backfill
08/30/2023 COT - RSPL - Sewer Passed 8/30/23: ok to backfill
09/15/2023 COT - RSEL - Grounding/Bonding Passed
09/15/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
09/15/2023 COT - RSEL - Electrical Underground Passed
09/15/2023 COT - RSBU - Preslab Passed
10/06/2023 COT - RSBU - Exterior Clips/Sheathing Passed 10/6/23 Missing only one anchor bolt marked with red x ok to proceed will check at intermediate
10/06/2023 COT - RSBU - Roof Nailing Passed
11/30/2023 BULD - Electrical Clearance Passed 1/12/24 clerance resent
11/30/2023 COT - RSPL - Gas Pressure Test Passed
12/11/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
01/03/2024 COT - RSBU - Interior Shear Bracing Passed
02/13/2024 COT - BULD - SWG Clearance Passed
03/05/2024 COT - RSEL - Electrical Final Passed
03/05/2024 COT - RSEL - Outdoor Lighting Passed
03/05/2024 COT - RSME - Mechanical Final Passed
03/05/2024 COT - RSPL - Plumbing Final Passed
03/05/2024 RSBU - Building Progress Passed
03/05/2024 ENGR Engineering Final Passed Grade. est. passed, no other concerns
03/07/2024 RSBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LOT 123 FINAL SPECIAL INSPECTION CERTIFICATE-2024-08-15_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 123 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 123 SPECIAL INSPECTION CERTIFICATE-2023-06-13_V1.PDF DOCUMENTS VIEW
LOT 123 PLOT PLAN_V1.PDF DOCUMENTS VIEW