Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
11/08/2023
Applicant:
Daria Hopkins
Description:
SFR 230.2380 T21-M0028

Permit Reviews

Permit Number - TC-MDP-0623-01138
Permit Status: Complete
Permit Description: SFR 230.2380 T21-M0028
Start Date Submittal Complete Date Status  
11/09/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 11/15/2023 APPROVED Review Details
03/08/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/12/2024 REQUIRES RESUBMIT Review Details
03/28/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 04/03/2024 REQUIRES RESUBMIT Review Details
05/03/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.3 05/06/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0623-01138
Permit Status: Complete
Permit Description: SFR 230.2380 T21-M0028
Date Description Comments
03/11/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
11/09/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/09/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/14/2023 Post-Tension Inspection Report is required.
06/09/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
03/11/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
11/14/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0623-01138
Permit Description: SFR 230.2380 T21-M0028
Total Completed Inspections - 21
Date Description Inspector Results Comments
01/29/2024 COT - RSPL - Rough Soil Passed
01/29/2024 COT - RSPL - Sewer Passed
01/29/2024 COT - RSPL - Yard Water Line Passed
02/01/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
02/01/2024 COT - RSBU - Preslab Passed
02/01/2024 COT - RSEL - Electrical Underground Passed
02/01/2024 COT - RSEL - Grounding/Bonding Passed
02/16/2024 COT - RSBU - Exterior Clips/Sheathing Passed
02/16/2024 COT - RSBU - Roof Nailing Passed
02/23/2024 BULD - Electrical Clearance Passed
03/08/2024 COT - RSPL - Gas Pressure Test Passed
03/11/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 3/11/24: Electrical wire has been installed into electrical outlet box at counter, pex line has been relocated and protected from damage, and attic access upstairs has been properly secured to bottom cord of rafter.
04/01/2024 COT - RSBU - Interior Shear Bracing Passed
05/10/2024 COT - BULD - SWG Clearance Passed
05/30/2024 ENGR Engineering Final Passed
05/30/2024 COT - RSEL - Electrical Final Passed
05/30/2024 COT - RSEL - Outdoor Lighting Passed
05/30/2024 COT - RSPL - Plumbing Final Passed
05/30/2024 RSBU - Building Progress Passed
05/31/2024 COT - RSME - Mechanical Final Passed
05/31/2024 RSBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
145405 PT LOT 18 COMPLETE REVISION-2024-05-02_V2.PDF DOCUMENTS VIEW
145405 PT LOT 18 COMPLETE-2024-03-07_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 18 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 18 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 18 SPECIAL INSPECTION CERTIFICATE-2023-11-08_V1.PDF DOCUMENTS VIEW