Permit: TC-MDP-0623-01136
Permit Details
Apply Date:
08/10/2023
Applicant:
Daria Hopkins
Description:
SFR 230.2380 T21-M0028
Permit Reviews
Permit Number - TC-MDP-0623-01136
Permit Status: Complete
Permit Description: SFR 230.2380 T21-M0028
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/28/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/02/2023 | APPROVED |
08/11/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 08/15/2023 | APPROVED |
02/27/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/04/2024 | REQUIRES RESUBMIT |
03/19/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 03/25/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0623-01136
Permit Status: Complete
Permit Description: SFR 230.2380 T21-M0028
Date | Description | Comments |
---|---|---|
08/11/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
08/11/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
08/14/2023 | Post-Tension Inspection Report is required. | |
06/09/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
08/14/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0623-01136
Permite Description: SFR 230.2380 T21-M0028
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/21/2023 | COT - RSBU - Exterior Clips/Sheathing | N/A | Re-inspection required (with fee) | Front porch missing hangers per plans, add studs at each end of 4x6 foyer beam to fully bear load, beam at kitchen missing second CS16 strap between beam and top plate, master suite missing hangers, shim all trimmers not making contact with headers, add shot pin at master bedroom, THA422 hangers at foyer not fully installed/nailed, second floor missing hangers, missing nails at sole plate in second floor, no truss calcs present. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0623-01136
Permit Description: SFR 230.2380 T21-M0028
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/06/2023 | COT - RSPL - Yard Water Line | Passed | 11/6/23: under pressure ok to backfill. Shading required. | |
11/06/2023 | COT - RSPL - Rough Soil | Passed | 11/6/23: under pressure ok to backfill. Shading required. | |
11/06/2023 | COT - RSPL - Sewer | Passed | 11/6/23: under pressure ok to backfill. Shading required. | |
11/14/2023 | COT - RSEL - Electrical Underground | Passed | ||
11/14/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
11/15/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
11/15/2023 | COT - RSBU - Preslab | Passed | ||
12/08/2023 | COT - RSBU - Roof Nailing | Passed | ||
01/09/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
01/31/2024 | BULD - Electrical Clearance | Passed | Electrical panel is properly installed, temporary power box is mounted on bottom of panel, and ground wire is connected to Ufer rebar. Okay to energize panel. ECO Clearance given to TEP. | |
01/31/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough-in is complete per code and plans. Okay to proceed with installation of insulation and drywall. | |
01/31/2024 | COT - RSPL - Gas Pressure Test | Passed | Gasline is holding 15# of air with no leaks. Okay to proceed. | |
02/21/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
04/03/2024 | COT - BULD - SWG Clearance | Passed | ||
04/25/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
04/25/2024 | COT - RSME - Mechanical Final | Passed | ||
04/25/2024 | COT - RSPL - Plumbing Final | Passed | ||
04/25/2024 | RSBU - Building Progress | Passed | ||
04/25/2024 | ENGR Engineering Final | Passed | ||
04/30/2024 | COT - RSEL - Electrical Final | Passed | ||
04/30/2024 | RSBU - Building Final | Passed |