Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
06/28/2024
Applicant:
Dana Petty
Description:
SFR 230.2690 T21-M0027

Permit Reviews

Permit Number - TC-MDP-0623-01132
Permit Status: Complete
Permit Description: SFR 230.2690 T21-M0027
Start Date Submittal Complete Date Status  
01/06/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/06/2025 APPROVED Review Details
06/28/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 07/01/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0623-01132
Permit Status: Complete
Permit Description: SFR 230.2690 T21-M0027
Date Description Comments
07/01/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
07/01/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
07/01/2024 Post-Tension Inspection Report is required.
06/09/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
01/06/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
07/01/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0623-01132
Permite Description: SFR 230.2690 T21-M0027
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
11/22/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required 11/22/24. Multiple branch circuits are tied together, check gusset plates, where wires are running across. Fire foam chases on second floor, check all penetrations at vapor barriers. Gas line not secured throughout. Seal penetrations between floors, stud shoes required at 2"x6" studs where pvc runs through, ceiling fixture requires correct screws.
12/16/2024 COT - RSBU - Interior Shear Bracing N/A Re-inspection required No
11/22/2024 COT - BULD - SWG Clearance N/A Not Ready Not ready 11:22:24

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0623-01132
Permit Description: SFR 230.2690 T21-M0027
Total Completed Inspections - 21
Date Description Inspector Results Comments
10/14/2024 COT - RSPL - Sewer Passed Okay to backfill. Shading is required. 10/14/2024
10/14/2024 COT - RSPL - Yard Water Line Passed Okay to backfill. Shading is required. 10/14/2024
10/14/2024 COT - RSPL - Rough Soil Passed Okay to backfill. Shading is required. 10/14/2024
10/23/2024 COT - RSBU - Excavation/Rebar/Zoning Passed 10-23-24 approved
10/23/2024 COT - RSBU - Preslab Passed 10-23-24, pre slab approved. Okay to pour.
10/23/2024 COT - RSEL - Electrical Underground Passed 10-23-24, conduit in place. Inspection approved.
10/23/2024 COT - RSEL - Grounding/Bonding Passed 10-23-24, approved.
11/08/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed pass
11/08/2024 COT - RSBU - Roof Nailing Passed pass
11/22/2024 COT - RSPL - Gas Pressure Test Passed 11/22/24 SWG pressure test at 15psi. Pass
11/26/2024 BULD - Electrical Clearance Passed 11-26-24, panel okay to be energized.
11/26/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 11-26-24, all items requiring corrections have been rectified. Residential intermediates approved.
12/18/2024 COT - RSBU - Interior Shear Bracing Passed 12/18/24 corrections made, ok to tape
01/30/2025 COT - BULD - SWG Clearance Passed 1/30/25 approval for SWG clearance
02/04/2025 COT - RSEL - Electrical Final Passed
02/04/2025 COT - RSEL - Outdoor Lighting Passed 2/4/25 pass
02/04/2025 COT - RSME - Mechanical Final Passed 2/4/25 pass
02/04/2025 COT - RSPL - Plumbing Final Passed 2/4/25 pass
02/04/2025 ENGR Engineering Final Passed CO Ready
02/04/2025 RSBU - Building Final Passed 2/4/25 pass
02/04/2025 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
151092 PT LOT 69 COMPLETE-2024-12-31_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 69 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 69 SPECIAL INSPECTION CERTIFICATE-2024-06-28_V1.PDF DOCUMENTS VIEW