Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Model Building Permit
Apply Date:
06/28/2024
Applicant:
Daria Hopkins
Description:
SFR 230.2690 T21-M0027

Permit Reviews

Permit Number - TC-MDP-0623-01132
Permit Status: Inspections
Permit Description: SFR 230.2690 T21-M0027
Start Date Submittal Complete Date Status  
06/28/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 07/01/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0623-01132
Permit Status: Inspections
Permit Description: SFR 230.2690 T21-M0027
Total Outstanding Activity Conditions - 3
Date Name
07/01/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
07/01/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
07/01/2024 Post-Tension Inspection Report is required.

Conditions

Permit Number - TC-MDP-0623-01132
Permit Status: Inspections
Permit Description: SFR 230.2690 T21-M0027
Date Description Comments
06/09/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/01/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0623-01132
Permite Description: SFR 230.2690 T21-M0027
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
11/22/2024 COT - BULD - SWG Clearance N/A Not Ready Not ready 11:22:24
11/22/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required 11/22/24. Multiple branch circuits are tied together, check gusset plates, where wires are running across. Fire foam chases on second floor, check all penetrations at vapor barriers. Gas line not secured throughout. Seal penetrations between floors, stud shoes required at 2"x6" studs where pvc runs through, ceiling fixture requires correct screws.
12/16/2024 COT - RSBU - Interior Shear Bracing N/A Re-inspection required No

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0623-01132
Permit Description: SFR 230.2690 T21-M0027
Total Completed Inspections - 13
Date Description Inspector Results Comments
10/14/2024 COT - RSPL - Sewer Passed Okay to backfill. Shading is required. 10/14/2024
10/14/2024 COT - RSPL - Yard Water Line Passed Okay to backfill. Shading is required. 10/14/2024
10/14/2024 COT - RSPL - Rough Soil Passed Okay to backfill. Shading is required. 10/14/2024
10/23/2024 COT - RSBU - Excavation/Rebar/Zoning Passed 10-23-24 approved
10/23/2024 COT - RSBU - Preslab Passed 10-23-24, pre slab approved. Okay to pour.
10/23/2024 COT - RSEL - Electrical Underground Passed 10-23-24, conduit in place. Inspection approved.
10/23/2024 COT - RSEL - Grounding/Bonding Passed 10-23-24, approved.
11/08/2024 COT - RSBU - Exterior Clips/Sheathing Passed pass
11/08/2024 COT - RSBU - Roof Nailing Passed pass
11/22/2024 COT - RSPL - Gas Pressure Test Passed 11/22/24 SWG pressure test at 15psi. Pass
11/26/2024 BULD - Electrical Clearance Passed 11-26-24, panel okay to be energized.
11/26/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 11-26-24, all items requiring corrections have been rectified. Residential intermediates approved.
12/18/2024 COT - RSBU - Interior Shear Bracing Passed 12/18/24 corrections made, ok to tape

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 69 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 69 SPECIAL INSPECTION CERTIFICATE-2024-06-28_V1.PDF DOCUMENTS VIEW