Permit: TC-MDP-0623-01127
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
6777 E PASEO DON OCTAVIO
Address NEW:
6777 E PASEO DON OCTAVIO
Apply Date:
06/28/2024
Applicant:
Dana Petty
Description:
SFR 230.2690 T21-M0027
Permit Reviews
Permit Number - TC-MDP-0623-01127
Permit Status: Complete
Permit Description: SFR 230.2690 T21-M0027
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/28/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 07/01/2024 | APPROVED |
| 01/06/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/06/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0623-01127
Permit Status: Complete
Permit Description: SFR 230.2690 T21-M0027
| Date | Description | Comments |
|---|---|---|
| 07/01/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 07/01/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 07/01/2024 | Post-Tension Inspection Report is required. | |
| 06/09/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 01/06/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 07/01/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0623-01127
Permite Description: SFR 230.2690 T21-M0027
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/10/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 12/10/24 wires bundled together against code, incorrect screws in fan boxes, must use provided hex screws, missing fire foam in downstairs bedroom. STOPPED INSPECTION-ADDITIONAL ITEMS MAY BE NOTED. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0623-01127
Permit Description: SFR 230.2690 T21-M0027
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/25/2024 | COT - RSPL - Yard Water Line | Passed | 10-25-24, approved. Okay to backfill. | |
| 10/25/2024 | COT - RSPL - Sewer | Passed | 10-25-24, approved. Okay to backfill. | |
| 10/25/2024 | COT - RSPL - Rough Soil | Passed | 10-25-24, approved. Okay to backfill. | |
| 11/04/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 11-4-24, excavation/setbacks per approved plans. Okay to pour concrete. | |
| 11/04/2024 | COT - RSBU - Preslab | Passed | 11-4-24, preslab per approved plans. Okay to pour concrete. | |
| 11/04/2024 | COT - RSEL - Electrical Underground | Passed | 11-4-24, electrical underground per approved plans. Okay to pour concrete. | |
| 11/04/2024 | COT - RSEL - Grounding/Bonding | Passed | 11-4-24, grounding/bonding per approved plans. Okay to pour concrete. | |
| 11/26/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 11-26-24, exterior clips/sheathing approved. Okay to continue construction. | |
| 11/26/2024 | COT - RSBU - Roof Nailing | Passed | 11-26-24, roof nailing approved | |
| 12/06/2024 | BULD - Electrical Clearance | Passed | 12-6-24, panel approved for TEP to energize panel. ECO clearance issued. | |
| 12/06/2024 | COT - RSPL - Gas Pressure Test | Passed | 12-6-24, gas pressure test verified at 15 psi. | |
| 12/12/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Corrections made 12/12/24 | |
| 12/27/2024 | COT - RSBU - Interior Shear Bracing | Passed | 12/27/24 passed, ok to tape | |
| 02/11/2025 | COT - BULD - SWG Clearance | Passed | Passed SWG CLEARANCE 2/11/25 | |
| 02/20/2025 | COT - RSEL - Electrical Final | Passed | 2/20/25 pass | |
| 02/20/2025 | COT - RSEL - Outdoor Lighting | Passed | 2/20/25 pass | |
| 02/20/2025 | COT - RSME - Mechanical Final | Passed | 2/20/25 pass | |
| 02/20/2025 | COT - RSPL - Plumbing Final | Passed | 2/20/25 pass | |
| 02/20/2025 | ENGR Engineering Final | Passed | Site is good. | |
| 02/20/2025 | RSBU - Building Final | Passed | 2/20/25 pass | |
| 02/20/2025 | RSBU - Building Progress | Passed | 2/20/25 pass |