Permit: TC-MDP-0623-01121
Permit Details
Apply Date:
06/22/2023
Applicant:
Andrea Flood
Description:
STF40K T20-M0039 Revision Truss Calcs
Permit Reviews
Permit Number - TC-MDP-0623-01121
Permit Status: Complete
Permit Description: STF40K T20-M0039 Revision Truss Calcs
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/28/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/02/2023 | APPROVED |
06/28/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 07/03/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0623-01121
Permit Status: Complete
Permit Description: STF40K T20-M0039 Revision Truss Calcs
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
06/30/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0623-01121
Permit Status: Complete
Permit Description: STF40K T20-M0039 Revision Truss Calcs
Date | Description | Comments |
---|---|---|
06/28/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
06/28/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
06/28/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
10/02/2023 | Post-Tension Inspection Report is required. | |
06/08/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/28/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
06/28/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0623-01121
Permite Description: STF40K T20-M0039 Revision Truss Calcs
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
COT - RSPL - Gas Pressure Test | N/A | Requested |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0623-01121
Permit Description: STF40K T20-M0039 Revision Truss Calcs
Total Completed Inspections - 20
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/26/2023 | COT - RSPL - Sewer | Passed | ||
07/26/2023 | COT - RSPL - Yard Water Line | Passed | ||
07/26/2023 | COT - RSPL - Rough Soil | Passed | ||
07/31/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
07/31/2023 | COT - RSBU - Preslab | Passed | ||
07/31/2023 | COT - RSEL - Electrical Underground | Passed | ||
07/31/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
08/28/2023 | COT - RSBU - Roof Nailing | Passed | ||
08/29/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | Corrections have been made. 8/29/2023 | |
09/25/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
09/25/2023 | BULD - Electrical Clearance | Passed | TEP ECO | |
10/12/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
12/06/2023 | COT - BULD - SWG Clearance | Passed | SWG clearance issued. | |
01/08/2024 | COT - RSEL - Electrical Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures. GFCI outlets are installed in kitchen, bathrooms, & garage. Electrical panel is properly labeled. | |
01/08/2024 | COT - RSEL - Outdoor Lighting | Passed | Exterior lights match was called out on plans and are fully operational. | |
01/08/2024 | COT - RSME - Mechanical Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures. GFCI outlets are installed in kitchen, bathrooms, & garage. Electrical panel is properly labeled. | |
01/08/2024 | COT - RSPL - Plumbing Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures. GFCI outlets are installed in kitchen, bathrooms, & garage. Electrical panel is properly labeled. | |
01/08/2024 | RSBU - Building Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures. GFCI outlets are installed in kitchen, bathrooms, & garage. Electrical panel is properly labeled. | |
01/08/2024 | RSBU - Building Progress | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures. GFCI outlets are installed in kitchen, bathrooms, & garage. Electrical panel is properly labeled. | |
01/08/2024 | ENGR Engineering Final | Passed |