Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Needs Resubmittal
Type:
Model Building Permit
Address NEW:
3309 N TYNDALL AV
Apply Date:
05/21/2026
Applicant:
Ana Chavez
Description:
New Residential Model De La Cruz- (Model master plan TC-MDP-0623-01107)

Permit Reviews

Permit Number - TC-MDP-0526-00360
Permit Status: Needs resubmittal
Permit Description: New Residential Model De La Cruz- (Model master plan TC-MDP-0623-01107)
Start Date Submittal Complete Date Status  
05/22/2026 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 06/11/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0526-00360
Permit Status: Needs resubmittal
Permit Description: New Residential Model De La Cruz- (Model master plan TC-MDP-0623-01107)
Total Outstanding Activity Conditions - 4
Date Name
05/22/2026 Please contact Pima County Addressing to add Unit 1 to the property address at Addressing@pima.gov or 520-724-9512
05/22/2026 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
06/11/2026 An intermediate Elevation Certificate is required PRIOR TO GRADING and/or PRE-SLAB INSPECTION.
06/11/2026 Submission of the final Elevation Certificate and completion of the Floodplain Use Permit is required PRIOR TO FINALING this permit.

Conditions

Permit Number - TC-MDP-0526-00360
Permit Status: Needs resubmittal
Permit Description: New Residential Model De La Cruz- (Model master plan TC-MDP-0623-01107)
Date Description Comments
05/22/2026 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.