Permit: TC-MDP-0526-00294
Permit Details
Status:
Inspections
Type:
Model Building Permit
Address:
9952 E LEBARON DR
Address NEW:
9952 E LEBARON DR
Apply Date:
08/19/2026
Applicant:
Celina Rodriguez
Description:
Mirador Ridge Skies 2013 Plan (Model master plan TC-MDP-0825-00417)
Permit Reviews
Permit Number - TC-MDP-0526-00294
Permit Status: Inspections
Permit Description: Mirador Ridge Skies 2013 Plan (Model master plan TC-MDP-0825-00417)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/25/2026 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 08/27/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0526-00294
Permit Status: Inspections
Permit Description: Mirador Ridge Skies 2013 Plan (Model master plan TC-MDP-0825-00417)
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 05/06/2026 | Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. |
| 05/06/2026 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 08/27/2026 | Prior to Final - Required Documents - Post-Installed Anchor Inspection Report is required. |
Conditions
Permit Number - TC-MDP-0526-00294
Permit Status: Inspections
Permit Description: Mirador Ridge Skies 2013 Plan (Model master plan TC-MDP-0825-00417)
| Date | Description | Comments |
|---|---|---|
| 05/06/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 05/06/2026 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0526-00294
Permit Description: Mirador Ridge Skies 2013 Plan (Model master plan TC-MDP-0825-00417)
Total Completed Inspections - 11
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/03/2026 | COT - RSPL - Sewer | Passed | 9-3-26 okay to backfill. Shading is required | |
| 09/03/2026 | COT - RSPL - Yard Water Line | Passed | 9-3-26 okay to backfill. Shading is required | |
| 09/03/2026 | COT - RSPL - Rough Soil | Passed | 9-3-26 okay to backfill. Shading is required | |
| 09/14/2026 | COT - RSEL - Electrical Underground | Passed | ||
| 09/15/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 9-15-26 all corrections have been made OK to pour | |
| 09/15/2026 | COT - RSBU - Preslab | Passed | 9-15-26 all corrections have been made OK to pour | |
| 09/29/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 9/29/26: exterior clips/framing approved. | |
| 09/29/2026 | COT - RSBU - Roof Nailing | Passed | 9/29/26: okay to dry-in roof. | |
| 10/14/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 10/14/2026 Verified A35's at garage shear wall per plan. Added fire caulk to opening behind tub and uncovered light fixture at rear patio. |
|
| 10/14/2026 | COT - RSPL - Gas Pressure Test | Passed | ||
| 10/14/2026 | BULD - Electrical Clearance | Passed | 10/14/2026 Clearance TEP ECO. |