Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Model Building Permit
Apply Date:
07/06/2026
Applicant:
Celina Rodriguez
Description:
Mirador Ridge Skies 2013 Plan (Model master plan TC-MDP-0825-00417)

Permit Reviews

Permit Number - TC-MDP-0526-00293
Permit Status: Inspections
Permit Description: Mirador Ridge Skies 2013 Plan (Model master plan TC-MDP-0825-00417)
Start Date Submittal Complete Date Status  
07/13/2026 SITE FROM MODEL PERMIT - SUBDIVISION v.1 07/17/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0526-00293
Permit Status: Inspections
Permit Description: Mirador Ridge Skies 2013 Plan (Model master plan TC-MDP-0825-00417)
Total Outstanding Activity Conditions - 4
Date Name
05/06/2026 Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections.
05/06/2026 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
07/17/2026 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
07/17/2026 Post-Installed Anchor Inspection Report is required.

Conditions

Permit Number - TC-MDP-0526-00293
Permit Status: Inspections
Permit Description: Mirador Ridge Skies 2013 Plan (Model master plan TC-MDP-0825-00417)
Date Description Comments
05/06/2026 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
05/06/2026 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0526-00293
Permite Description: Mirador Ridge Skies 2013 Plan (Model master plan TC-MDP-0825-00417)
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
08/19/2026 COT - RSBU - Roof Nailing N/A Re-inspection required 8-19-26 fix sthd10 hold down spalling right of garage exterior* add shot pins to marked location throughout* add anchor bolt to Marked locations around perimeter throughout also anchor bolts should be driven in middle third of 2 x 4 sole plate* RSP4 missing at east wall exterior* trimmer stud nail to King stud shall be 8 inches on center at all window framing areas throughout refer t detail sn4 13.a* H2 .5 missing at optional Den bedroom four at West wall* stopped inspection at this time. More items may be added truss calcs. And roof Nailing was not walked

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0526-00293
Permit Description: Mirador Ridge Skies 2013 Plan (Model master plan TC-MDP-0825-00417)
Total Completed Inspections - 13
Date Description Inspector Results Comments
08/03/2026 COT - RSPL - Backwater Valve Passed
08/03/2026 COT - RSPL - Rough Soil Passed 08/03/2026
Holding under test. Ok to backfill with shading material.
08/03/2026 COT - RSPL - Sewer Passed 08/03/2026
Holding under test. Ok to backfill with shading material.
08/03/2026 COT - RSPL - Yard Water Line Passed 08/03/2026
Holding under test. Ok to backfill with shading material.
08/07/2026 COT - RSBU - Excavation/Rebar/Zoning Passed 8-7-26 okay to pour.
08/07/2026 COT - RSBU - Preslab Passed 8-7-26 okay to pour.
08/07/2026 COT - RSEL - Electrical Underground Passed
08/20/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 8-20-26 all corrections have been made OK to continue
08/20/2026 COT - RSBU - Roof Nailing Passed 8-20-26 all corrections have been made OK to continue
09/03/2026 BULD - Electrical Clearance Passed 9-3-26. ECO clearance approved
09/04/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 9-4-26 all items have been corrected
09/04/2026 COT - RSPL - Gas Pressure Test Passed 9-4-26 Gas pressure test approved
09/18/2026 COT - RSBU - Interior Shear Bracing Passed 9-18-26 All items were corrected during the time of the inspection OK to proceed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
MIRADOR RIDGE - LOT 192 START_V1.PDF DOCUMENTS VIEW
MRS 192 SIC-2026-07-06_V1.PDF DOCUMENTS VIEW