Permit Details

Status:
Inspections
Type:
Model Building Permit
Apply Date:
06/05/2025
Applicant:
Dana Petty
Description:
Single Family Residence Plan 130.1600 (Model master plan TC-MDP-0924-00985)

Permit Reviews

Permit Number - TC-MDP-0525-00320
Permit Status: Inspections
Permit Description: Single Family Residence Plan 130.1600 (Model master plan TC-MDP-0924-00985)
Start Date Submittal Complete Date Status  
01/15/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/16/2026 APPROVED Review Details
06/06/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.1 06/17/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0525-00320
Permit Status: Inspections
Permit Description: Single Family Residence Plan 130.1600 (Model master plan TC-MDP-0924-00985)
Total Outstanding Activity Conditions - 2
Date Name
06/10/2025 Post-Installed Anchor Inspection Report is required.
06/10/2025 Post-Tension Inspection Report is required.

Conditions

Permit Number - TC-MDP-0525-00320
Permit Status: Inspections
Permit Description: Single Family Residence Plan 130.1600 (Model master plan TC-MDP-0924-00985)
Date Description Comments
05/30/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
05/30/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0525-00320
Permite Description: Single Family Residence Plan 130.1600 (Model master plan TC-MDP-0924-00985)
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
11/04/2025 COT - RSBU - Preslab N/A Re-inspection required 11.04.2025
Add sleeve to >12” overexposed cable at southwest corner of slab, same cable has exposed wired midway that needs sleeve, move exterior STHD8 an inch away from slab edge, tamp down loose soil interior pad, missing 16”x16”x20” embedded footing in garage for bollard.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0525-00320
Permit Description: Single Family Residence Plan 130.1600 (Model master plan TC-MDP-0924-00985)
Total Completed Inspections - 21
Date Description Inspector Results Comments
10/29/2025 COT - RSPL - Rough Soil Passed 10.29.2025
Approved and under test, okay to backfill with shading materials. Ensure remaining large rocks cleared before.
10/29/2025 COT - RSPL - Sewer Passed 10.29.2025
Approved and under test, okay to backfill with shading materials. Ensure remaining large rocks cleared before.
10/29/2025 COT - RSPL - Yard Water Line Passed 10.29.2025
Approved and under test to meter, okay to backfill with shading materials.
11/04/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 11.04.2025
Approved per site plan.
11/04/2025 COT - RSEL - Electrical Underground Passed
11/04/2025 COT - RSBU - Preslab Passed 11.04.2025
Corrections made same day. Verified updated plans showing deleted bollard in garage. Okay for concrete placement.
11/14/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 11.14.2025
All corrections made to 11.12.2025 inspection.
11/14/2025 COT - RSBU - Roof Nailing Passed 11.14.2025
All corrections made to 11.12.2025 inspection.
11/21/2025 BULD - Electrical Clearance Passed 11.21.2025
Clearance for TEP ECO.
11/21/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 11.21.2025
Approved, added blocking to recessed light fixture within 12" of PEX line and foamed top plate penetrations as marked.
11/21/2025 COT - RSEL - Grounding/Bonding Passed 11.21.2025
Tie-in to MSP.
11/21/2025 COT - RSPL - Gas Pressure Test Passed 11.21.2025
Approved and holding under test.
11/21/2025 RSBU - Building Progress Passed
12/01/2025 COT - RSBU - Interior Shear Bracing Passed 12-1-25: interior shear bracing approved. Okay to tape & texture.
01/12/2026 COT - BULD - SWG Clearance Passed 01/12/2026
Clearance for Southwest Gas.
01/14/2026 COT - RSEL - Outdoor Lighting Passed
01/14/2026 COT - RSEL - Electrical Final Passed 01/14/2026
Verified plugged knockout at main panel.
01/14/2026 COT - RSME - Mechanical Final Passed
01/14/2026 COT - RSPL - Plumbing Final Passed
01/14/2026 ENGR Engineering Final Passed
01/14/2026 RSBU - Building Final Passed

Documents

File Name Document Type  
157678 PT LOT 125 COMPLETE-2026-01-15_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 125 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 125 SPECIAL INSPECTION CERTIFICATE-2025-06-05_V1.PDF DOCUMENTS VIEW