Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Passed

Inspection History: COT - RSBU - Preslab  

Date Description Inspector Results Comments
11/04/2025 COT - RSBU - Preslab   Passed 11.04.2025
Corrections made same day. Verified updated plans showing deleted bollard in garage. Okay for concrete placement.
11/04/2025 COT - RSBU - Preslab   Re-inspection required 11.04.2025
Add sleeve to >12” overexposed cable at southwest corner of slab, same cable has exposed wired midway that needs sleeve, move exterior STHD8 an inch away from slab edge, tamp down loose soil interior pad, missing 16”x16”x20” embedded footing in garage for bollard.