Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
09/03/2025
Applicant:
Ramon VALDEZ
Description:
Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)

Permit Reviews

Permit Number - TC-MDP-0525-00311
Permit Status: Complete
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Start Date Submittal Complete Date Status  
11/10/2025 ADMINISTRATIVE v.1 11/10/2025 REQUIRES RESUBMIT Review Details
11/04/2025 RESTAMP - RESIDENTIAL v.1 11/04/2025 APPROVED Review Details
11/17/2025 ADMINISTRATIVE v.2 11/17/2025 APPROVED Review Details
09/04/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 09/23/2025 REQUIRES RESUBMIT Review Details
10/22/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 11/04/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0525-00311
Permit Status: Complete
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Date Description Comments
05/28/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
09/26/2025 An intermediate Elevation Certificate is required PRIOR TO GRADING and/or PRE-SLAB INSPECTION.
09/26/2025 Submission of the final Elevation Certificate and completion of the Floodplain Use Permit is required PRIOR TO FINALING this permit.
05/28/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
05/28/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
09/18/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0525-00311
Permite Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
02/23/2026 COT - BULD - SWG Clearance N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0525-00311
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Total Completed Inspections - 20
Date Description Inspector Results Comments
11/21/2025 COT - RSPL - Rough Soil Passed
11/21/2025 COT - RSPL - Sewer Passed
11/25/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
11/25/2025 COT - RSEL - Grounding/Bonding Passed
11/25/2025 COT - RSBU - Preslab and floodplain Passed
12/09/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
12/09/2025 COT - RSBU - Roof Nailing Passed
12/11/2025 BULD - Electrical Clearance Passed Ready for temp power CLEARANCE ECO
12/11/2025 COT - RSBU - Interior Shear Bracing Passed Fire wall in place 12/11/25
12/11/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Passed 12/11/25
02/23/2026 COT - RSEL - Electrical Final Passed
02/23/2026 COT - RSEL - Electrical Underground Passed
02/23/2026 COT - RSEL - Outdoor Lighting Passed
02/23/2026 COT - RSME - Mechanical Final Passed
02/23/2026 COT - RSPL - Plumbing Final Passed
02/23/2026 COT - RSPL - Yard Water Line Passed
02/23/2026 RSBU - Building Final Passed
02/23/2026 RSBU - Building Progress Passed
02/25/2026 COT - RSPL - Gas Pressure Test Passed
03/04/2026 ENGR Engineering Final Passed Site is complete in accordance with approved plans.

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL (SSRS).PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-MODEL_V1.PDF DOCUMENTS VIEW