Permit Details

Status:
Inspections
Type:
Model Building Permit
Address NEW:
825 E 36TH ST UNIT 1
Apply Date:
09/02/2025
Applicant:
Brisa Soto
Description:
Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)

Permit Reviews

Permit Number - TC-MDP-0525-00309
Permit Status: Inspections
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Start Date Submittal Complete Date Status  
09/03/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 09/22/2025 REQUIRES RESUBMIT Review Details
11/12/2025 ADMINISTRATIVE v.1 11/12/2025 REQUIRES RESUBMIT Review Details
11/12/2025 RESTAMP - RESIDENTIAL v.1 11/14/2025 APPROVED Review Details
11/04/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 11/12/2025 APPROVED Review Details
11/25/2025 ADMINISTRATIVE v.2 11/25/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0525-00309
Permit Status: Inspections
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Total Outstanding Activity Conditions - 2
Date Name
09/09/2025 Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections.
09/19/2025 Prior to Final

Conditions

Permit Number - TC-MDP-0525-00309
Permit Status: Inspections
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Date Description Comments
05/28/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
05/28/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
05/28/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
09/17/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0525-00309
Permite Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
12/04/2025 COT - RSPL - Yard Water Line N/A Not Ready 12-4-25: not ready.
12/16/2025 COT - RSBU - Firewall/Fire Barrier/Firestop N/A Partial Pass 12.16.25
Approved

Partial pass pending remaining 5/8 gyp and insulation on either side of current center board
12/04/2025 COT - RSEL - Grounding/Bonding N/A Partial Pass 12-4-25: partial pass for 2-UFERS.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0525-00309
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Total Completed Inspections - 18
Date Description Inspector Results Comments
11/28/2025 COT - RSPL - Rough Soil Passed Okay to backfill. Shading material required. 11/28/2025
12/05/2025 COT - RSPL - Yard Water Line Passed 12/5/2025 approved. Okay to backfill. Shading required.
12/05/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Corrections were made. Okay for concrete placement in. 12/5/2025
12/05/2025 COT - RSBU - Preslab Passed Corrections were made. Okay for concrete placement in. 12/5/2025
12/16/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 12.16.25
Approved
12/16/2025 COT - RSBU - Roof Nailing Passed 12.16.25
Approved
12/26/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Ok to insulate and sheet rock throughout.
12/26/2025 BULD - Electrical Clearance Passed This clearance is for 825 E. 36th Street, Units #1 & #2. Ok to set meters and,begin service.
01/12/2026 COT - RSBU - Interior Shear Bracing Passed
02/02/2026 COT - RSPL - Sewer Passed 2-2-26: verified sewer under test. Okay to backfill trench using shading materials.
02/06/2026 COT - RSEL - Electrical Underground Passed
03/20/2026 COT - RSME - Mechanical Final Passed
03/20/2026 COT - RSPL - Plumbing Final Passed
03/20/2026 ENGR Engineering Final Passed Site is complete in accordance with approved plans.
03/20/2026 COT - RSPL - Backwater Valve Passed
03/23/2026 COT - RSEL - Electrical Final Passed
03/23/2026 COT - RSEL - Outdoor Lighting Passed
03/23/2026 RSBU - Building Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW