Permit: TC-MDP-0524-00687
Permit Details
Apply Date:
07/25/2024
Applicant:
Celina Rodriguez
Description:
SFR BT1465-130 T22-M0011
Permit Reviews
Permit Number - TC-MDP-0524-00687
Permit Status: Issued
Permit Description: SFR BT1465-130 T22-M0011
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/29/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/05/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0524-00687
Permit Status: Issued
Permit Description: SFR BT1465-130 T22-M0011
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
05/30/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
08/05/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
08/05/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
08/05/2024 | Post-Tension Inspection Report is required. |
Conditions
Permit Number - TC-MDP-0524-00687
Permit Status: Issued
Permit Description: SFR BT1465-130 T22-M0011
Date | Description | Comments |
---|---|---|
05/30/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-MDP-0524-00687
Permite Description: SFR BT1465-130 T22-M0011
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
COT - RSBU - Interior Shear Bracing | N/A | Scheduled |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0524-00687
Permit Description: SFR BT1465-130 T22-M0011
Total Completed Inspections - 13
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/20/2024 | COT - RSPL - Backwater Valve | Passed | ||
08/20/2024 | COT - RSPL - Rough Soil | Passed | ||
08/20/2024 | COT - RSPL - Yard Water Line | Passed | ||
08/20/2024 | COT - RSPL - Sewer | Passed | ||
08/28/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Forms are set, masa clips are installed 4' apart, shear wall Simpson straps are installed per plan, underground plumbing is properly wrapped with foam, post tension cabling is properly spaced out per plan and 3rd party inspection has been performed, Ufer ground is installed on transformer side of garage. Underground electrical for kitchen island is installed. Okay to pour concrete slab and footings. | |
08/28/2024 | COT - RSBU - Preslab | Passed | Forms are set, masa clips are installed 4' apart, shear wall Simpson straps are installed per plan, underground plumbing is properly wrapped with foam, post tension cabling is properly spaced out per plan and 3rd party inspection has been performed, Ufer ground is installed on transformer side of garage. Underground electrical for kitchen island is installed. Okay to pour concrete slab and footings. | |
08/28/2024 | COT - RSEL - Electrical Underground | Passed | Forms are set, masa clips are installed 4' apart, shear wall Simpson straps are installed per plan, underground plumbing is properly wrapped with foam, post tension cabling is properly spaced out per plan and 3rd party inspection has been performed, Ufer ground is installed on transformer side of garage. Underground electrical for kitchen island is installed. Okay to pour concrete slab and footings. | |
09/16/2024 | COT - RSBU - Roof Nailing | Passed | ||
10/23/2024 | COT - RSPL - Gas Pressure Test | Passed | Gas line holding 15# air pressure. Okay to proceed with other work. | |
10/23/2024 | COT - RSEL - Grounding/Bonding | Passed | 10-23-24: bond wire is attached to Ufer ground and gas line. Okay to proceed. | |
10/23/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | 10/23/24: lateral bracing is installed, anchor bolts are installed in garage shear wall. Okay to proceed. | |
10/23/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | M, P, AND E is complete. Okay to proceed with installation of insulation and drywall. | |
11/01/2024 | BULD - Electrical Clearance | Passed | 11-1-24, electrical ok to be energized. |
Scheduled Inspections
Scheduled Inspections - TC-MDP-0524-00687
Status: Issued
Description: SFR BT1465-130 T22-M0011
Scheduled Date | Description | Entered By | Entered Date |
---|---|---|---|
11/05/2024 | COT - RSBU - Interior Shear Bracing | Scheduled |