Permit: TC-MDP-0524-00685
Permit Details
Apply Date:
06/26/2024
Applicant:
Celina Rodriguez
Description:
SFR BT1465-130 T22-M0011
Permit Reviews
Permit Number - TC-MDP-0524-00685
Permit Status: Issued
Permit Description: SFR BT1465-130 T22-M0011
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/27/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 06/28/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0524-00685
Permit Status: Issued
Permit Description: SFR BT1465-130 T22-M0011
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
05/30/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
06/27/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
06/27/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
06/27/2024 | Post-Tension Inspection Report is required. |
06/27/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0524-00685
Permit Status: Issued
Permit Description: SFR BT1465-130 T22-M0011
Date | Description | Comments |
---|---|---|
05/30/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0524-00685
Permit Description: SFR BT1465-130 T22-M0011
Total Completed Inspections - 12
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/07/2024 | COT - RSPL - Rough Soil | Passed | 8/7/24: Underground plumbing is complete and under a water test with no leaks. Okay to shade pipe and backfill trenches. | |
08/07/2024 | COT - RSPL - Sewer | Passed | 8/7/24: Underground plumbing is connected to sewer main and is complete. Entire waste line is under a water test with no leaks. Okay to shade pipe and backfill trenches. | |
08/07/2024 | COT - RSPL - Yard Water Line | Passed | 8/7/24: main water line trench is dug, pex line is installed in trench, and line is under 70psi air pressure test with no leaks. Okay to backfill trench within 5' of meter box. | |
08/16/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is evenly spaced, masa clips are evenly spaced and secured to concrete forms, shear wall straps are properly placed to plan requirements and secured to the concrete forms, all underground plumbing pipes are properly wrapped with foam, underground electrical conduit is installed for kitchen island, additional rebar reinforcement is installed per plan, and 20' rebar is properly installed for Ufer ground. Okay to pour concrete for footings and slab. | |
08/16/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is evenly spaced, masa clips are evenly spaced and secured to concrete forms, shear wall straps are properly placed to plan requirements and secured to the concrete forms, all underground plumbing pipes are properly wrapped with foam, underground electrical conduit is installed for kitchen island, additional rebar reinforcement is installed per plan, and 20' rebar is properly installed for Ufer ground. Okay to pour concrete for footings and slab. | |
08/16/2024 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, post tension cabling is evenly spaced, masa clips are evenly spaced and secured to concrete forms, shear wall straps are properly placed to plan requirements and secured to the concrete forms, all underground plumbing pipes are properly wrapped with foam, underground electrical conduit is installed for kitchen island, additional rebar reinforcement is installed per plan, and 20' rebar is properly installed for Ufer ground. Okay to pour concrete for footings and slab. | |
08/28/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | Bottom plate is properly secured to concrete floor, plywood sheathing on shear walls is properly secured to studs per plan requirements, and shear wall hold downs are properly secured to floors and walls. | |
08/28/2024 | COT - RSBU - Roof Nailing | Passed | Plywood sheathing is properly secured to trusses, all Simpson truss clips and hangers are properly attached to top plates and girder truss. | |
10/22/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
10/25/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 10/25/24: Items noted on 10-22-24 inspection have been corrected. Okay to proceed with installation of insulation and drywall. | |
10/25/2024 | COT - RSPL - Gas Pressure Test | Passed | Gas lines are pressurized to 15 psi with no leaks. Okay to proceed with further work. | |
11/01/2024 | BULD - Electrical Clearance | Passed | 11-1-24, electrical panel cleared to be be energized. |