Permit: TC-MDP-0524-00681
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
6826 E PASEO DE VILLALOBOS
Address NEW:
6826 E PASEO DE VILLALOBOS
Apply Date:
06/05/2024
Applicant:
Dana Petty
Description:
SFR 230.2690 T21-M0027
Permit Reviews
Permit Number - TC-MDP-0524-00681
Permit Status: Complete
Permit Description: SFR 230.2690 T21-M0027
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/06/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 06/07/2024 | APPROVED |
| 11/07/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/07/2024 | APPROVED |
| 01/30/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/30/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0524-00681
Permit Status: Complete
Permit Description: SFR 230.2690 T21-M0027
| Date | Description | Comments |
|---|---|---|
| 11/07/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 06/06/2024 | Post-Installed Anchor Inspection Report is required. | |
| 06/06/2024 | Post-Tension Inspection Report is required. | |
| 05/30/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 05/30/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 06/06/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0524-00681
Permite Description: SFR 230.2690 T21-M0027
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/31/2024 | COT - BULD - SWG Clearance | N/A | Canceled | Canceled by Jamie |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0524-00681
Permit Description: SFR 230.2690 T21-M0027
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/06/2024 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 9/6/2024 | |
| 09/06/2024 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading required. 9/6/2024 | |
| 09/06/2024 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 9/6/2024 | |
| 09/13/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 09/13/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 09/18/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 09/18/2024 | COT - RSBU - Preslab | Passed | ||
| 09/27/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 10/08/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 10/25/2024 | BULD - Electrical Clearance | Passed | 10-25-24, items from previous inspection have been corrected. No additional corrections noted. Intermediates and electrical clearance approved. | |
| 10/25/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 10-25-24, items noted from previous inspection have been corrected. Residential intermediates approved. | |
| 10/25/2024 | COT - RSPL - Gas Pressure Test | Passed | 10-25-24, items from previous inspection have been corrected. No additional corrections noted. Intermediates approved. | |
| 11/07/2024 | COT - RSBU - Interior Shear Bracing | Passed | 11-7-24, interior shear wall approved. Okay to tape & texture drywall. | |
| 01/09/2025 | COT - BULD - SWG Clearance | Passed | passed clearance SWG 1/9/25 | |
| 01/09/2025 | COT - RSEL - Outdoor Lighting | Passed | passed 1/9/25 | |
| 01/13/2025 | ENGR Engineering Final | Passed | CO Ready, nursery stake still in place | |
| 01/14/2025 | COT - RSEL - Electrical Final | Passed | 1/14/25 corrections made | |
| 01/14/2025 | COT - RSME - Mechanical Final | Passed | 1/14/25 corrections made | |
| 01/14/2025 | COT - RSPL - Plumbing Final | Passed | 1/14/25 corrections made | |
| 01/14/2025 | RSBU - Building Final | Passed | 1/14/25 corrections made | |
| 01/14/2025 | RSBU - Building Progress | Passed | passed final 1/14/25 |