Permit: TC-MDP-0524-00679
Permit Details
Apply Date:
06/03/2024
Applicant:
Daria Hopkins
Description:
SFR 230.2690 T21-M0027
Permit Reviews
Permit Number - TC-MDP-0524-00679
Permit Status: Issued
Permit Description: SFR 230.2690 T21-M0027
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/04/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 06/05/2024 | APPROVED |
09/18/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/18/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0524-00679
Permit Status: Issued
Permit Description: SFR 230.2690 T21-M0027
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
05/30/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - TC-MDP-0524-00679
Permit Status: Issued
Permit Description: SFR 230.2690 T21-M0027
Date | Description | Comments |
---|---|---|
06/04/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
06/04/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
06/04/2024 | Post-Tension Inspection Report is required. | |
05/30/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/04/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0524-00679
Permit Description: SFR 230.2690 T21-M0027
Total Completed Inspections - 14
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/25/2024 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading is required. 7/25/2024 | |
07/25/2024 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading is required. 7/25/2024 | |
07/25/2024 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading is required. 7/25/2024 | |
07/31/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
07/31/2024 | COT - RSBU - Preslab | Passed | ||
07/31/2024 | COT - RSEL - Electrical Underground | Passed | ||
07/31/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
08/20/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | Missing 2x underneath beam near stairway. Nail 2x6 stud to exterior in master bathroom. Provide cs16 strap to top plates. Missing king stud at SGD. Nailing pattern second floor bottom plate not per schedule. 8/20/2024 | |
08/26/2024 | COT - RSBU - Roof Nailing | Passed | ||
09/20/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
09/26/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 9/26/2024 | |
09/26/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Approved. Corrections were made. 9/26/2024 | |
10/14/2024 | COT - RSBU - Interior Shear Bracing | Passed | Passed interior shear wall bracing 10/14/24 | |
11/19/2024 | COT - BULD - SWG Clearance | Passed | 11-19-24, approved for Southwest Gas to install meter. |