Permit: TC-MDP-0524-00657
Permit Details
Apply Date:
05/28/2024
Applicant:
Joshua Swinney
Description:
Great Sand Dunes SFR Model Escalara
Permit Reviews
Permit Number - TC-MDP-0524-00657
Permit Status: Inspections
Permit Description: Great Sand Dunes SFR Model Escalara
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/30/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 06/03/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0524-00657
Permit Status: Inspections
Permit Description: Great Sand Dunes SFR Model Escalara
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
05/28/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
06/03/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
06/03/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
06/03/2024 | Post-Tension Inspection Report is required. |
06/03/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0524-00657
Permit Status: Inspections
Permit Description: Great Sand Dunes SFR Model Escalara
Date | Description | Comments |
---|---|---|
06/03/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
05/28/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/03/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0524-00657
Permite Description: Great Sand Dunes SFR Model Escalara
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/14/2024 | COT - RSBU - Exterior Clips/Sheathing | N/A | Re-inspection required | 10/14/24: wrong amount of trimmers at back sliding glass door frame. Anchor bolts at shear wall 9 not to plans. Rsp clip needs nailing at back south east corner. Floor trust at 2nd bearing point in garage need h25 clips. Shear wall 7 second floor bottom plate nailing not to schedule stopped inspection can add more at next inspection |
10/14/2024 | COT - RSBU - Roof Nailing | N/A | Re-inspection required | 10/14/24: wrong amount of trimmers at back sliding glass door frame. Anchor bolts at shear wall 9 not to plans. Rsp clip needs nailing at back south east corner. Floor trust at 2nd bearing point in garage need h25 clips. Shear wall 7 second floor bottom plate nailing not to schedule stopped inspection can add more at next inspection |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0524-00657
Permit Description: Great Sand Dunes SFR Model Escalara
Total Completed Inspections - 10
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/11/2024 | COT - RSPL - Backwater Valve | Passed | Under plumbing is installed and connected to main sewer line. Backwater valve is installed between two clean outs. Entire system is under a water test with no leaks. | |
09/11/2024 | COT - RSPL - Rough Soil | Passed | Under plumbing is installed and connected to main sewer line. Backwater valve is installed between two clean outs. Entire system is under a water test with no leaks. | |
09/11/2024 | COT - RSPL - Sewer | Passed | Under plumbing is installed and connected to main sewer line. Backwater valve is installed between two clean outs. Entire system is under a water test with no leaks. | |
09/20/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
09/20/2024 | COT - RSBU - Preslab | Passed | ||
09/20/2024 | COT - RSEL - Electrical Underground | Passed | ||
09/20/2024 | COT - RSPL - Yard Water Line | Passed | ||
09/20/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
10/21/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | 10/21/24: All items noted on last inspection have been corrected. Okay to proceed with rough-in of M, P, AND E. | |
10/21/2024 | COT - RSBU - Roof Nailing | Passed | 10/21/24: All items noted on last inspection have been corrected. Okay to proceed with rough-in of M, P, AND E. |