Permit Details

Status:
Inspections
Type:
Model Building Permit
Address:
9579 E HARKES DR
Apply Date:
06/21/2024
Applicant:
Brianna Quiroz
Description:
Big Bend Model Plan La Escalera

Permit Reviews

Permit Number - TC-MDP-0524-00651
Permit Status: Inspections
Permit Description: Big Bend Model Plan La Escalera
Start Date Submittal Complete Date Status  
06/21/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 06/25/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0524-00651
Permit Status: Inspections
Permit Description: Big Bend Model Plan La Escalera
Total Outstanding Activity Conditions - 5
Date Name
05/24/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
06/24/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/24/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/24/2024 Post-Tension Inspection Report is required.
06/24/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Conditions

Permit Number - TC-MDP-0524-00651
Permit Status: Inspections
Permit Description: Big Bend Model Plan La Escalera
Date Description Comments
06/25/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
05/24/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/24/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0524-00651
Permite Description: Big Bend Model Plan La Escalera
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
10/21/2024 COT - RSPL - Yard Water Line N/A Partial Pass PARTIAL PASS--Water meter is not installed and water line to house is under 60# psi pressure with no leaks. Okay to shade pipe and backfill trench.
01/29/2025 BULD - Electrical Clearance N/A Not Ready 1/29/25 not ready, missing breakers for temp power
01/29/2025 COT - BULD - SWG Clearance N/A Not Applicable n/a
12/03/2024 COT - RSBU - Exterior Clips/Sheathing N/A Re-inspection required 12-3-24, missing shear walls at garage, nailing at shear wall near staircase and on north-side of dining room not per schedule- plans call for 2 inches on center. Also, A-35's throughout on second floor are not nailed flush to top plates and some are missing nails altogether
12/03/2024 COT - RSBU - Roof Nailing N/A Re-inspection required 12-3-24, missing shear walls at garage,nailing at shear wall near staircase and on north-side of dining room not per schedule- plans call for 2 inches on center. Also, A-35's throughout on second floor are not nailed flush to top plates and some are missing nails altogether
01/29/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable n/a

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0524-00651
Permit Description: Big Bend Model Plan La Escalera
Total Completed Inspections - 10
Date Description Inspector Results Comments
10/21/2024 COT - RSPL - Rough Soil Passed Underground plumbing is complete and under a water test with no leaks. Okay to shade pipe and backfill trenches.
10/21/2024 COT - RSPL - Sewer Passed Sewer line is connected and under water pressure test with no leaks. Okay to shade pipe and backfill trench.
11/01/2024 COT - RSBU - Excavation/Rebar/Zoning Passed 11-1-24, per approved plans. Okay to pour concrete.
11/01/2024 COT - RSBU - Preslab Passed 11-1-24, pre slab per approved plans. Okay to pour concrete.
11/01/2024 COT - RSEL - Electrical Underground Passed 11-1-24, per approved plans. Okay to pour concrete.
11/01/2024 COT - RSEL - Grounding/Bonding Passed 11-1-24, per approved plans. Okay to pour concrete.
01/29/2025 COT - RSBU - Exterior Clips/Sheathing Passed 1/29/25 pass
01/29/2025 COT - RSBU - Roof Nailing Passed 1/29/25 pass
01/31/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 1/31/25 corrections were made, pass
02/20/2025 COT - RSBU - Interior Shear Bracing Passed 2/20/25 pass

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
PHASE 1 LOT 69 PLOT PLAN_V1.PDF DOCUMENTS VIEW
PHASE 1A LOT 69 SIC-2024-06-21_V1.PDF DOCUMENTS VIEW