Permit Details

Status:
Complete
Type:
Model Building Permit
Address:
9579 E HARKES DR
Address NEW:
9579 E HARKES DR
Apply Date:
06/21/2024
Applicant:
Brianna Quiroz
Description:
Big Bend Model Plan La Escalera

Permit Reviews

Permit Number - TC-MDP-0524-00651
Permit Status: Complete
Permit Description: Big Bend Model Plan La Escalera
Start Date Submittal Complete Date Status  
06/21/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 06/25/2024 APPROVED Review Details
06/20/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 06/23/2025 APPROVED Review Details
06/09/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/10/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-MDP-0524-00651
Permit Status: Complete
Permit Description: Big Bend Model Plan La Escalera
Date Description Comments
06/25/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
06/24/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/24/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/24/2024 Post-Tension Inspection Report is required.
05/24/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
05/24/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
06/24/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
06/24/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0524-00651
Permite Description: Big Bend Model Plan La Escalera
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
01/29/2025 COT - BULD - SWG Clearance N/A Not Applicable n/a
12/03/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Re-inspection required 12-3-24, missing shear walls at garage, nailing at shear wall near staircase and on north-side of dining room not per schedule- plans call for 2 inches on center. Also, A-35's throughout on second floor are not nailed flush to top plates and some are missing nails altogether
12/03/2024 COT - RSBU - Roof Nailing N/A Re-inspection required 12-3-24, missing shear walls at garage,nailing at shear wall near staircase and on north-side of dining room not per schedule- plans call for 2 inches on center. Also, A-35's throughout on second floor are not nailed flush to top plates and some are missing nails altogether
01/29/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable n/a
07/11/2025 ENGR Engineering Final N/A Not Ready Solar generation meter not installed. Potential electrical safety hazard. Picture included.
07/11/2025 COT - RSEL - Electrical Final N/A Re-inspection required 7-11-25: missing shackle at water heater breaker and adjust loose light fixture at loft.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0524-00651
Permit Description: Big Bend Model Plan La Escalera
Total Completed Inspections - 19
Date Description Inspector Results Comments
10/21/2024 COT - RSPL - Rough Soil Passed Underground plumbing is complete and under a water test with no leaks. Okay to shade pipe and backfill trenches.
10/21/2024 COT - RSPL - Sewer Passed Sewer line is connected and under water pressure test with no leaks. Okay to shade pipe and backfill trench.
11/01/2024 COT - RSBU - Excavation/Rebar/Zoning Passed 11-1-24, per approved plans. Okay to pour concrete.
11/01/2024 COT - RSBU - Preslab Passed 11-1-24, pre slab per approved plans. Okay to pour concrete.
11/01/2024 COT - RSEL - Electrical Underground Passed 11-1-24, per approved plans. Okay to pour concrete.
11/01/2024 COT - RSEL - Grounding/Bonding Passed 11-1-24, per approved plans. Okay to pour concrete.
01/29/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 1/29/25 pass
01/29/2025 COT - RSBU - Roof Nailing Passed 1/29/25 pass
01/31/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 1/31/25 corrections were made, pass
02/20/2025 COT - RSBU - Interior Shear Bracing Passed 2/20/25 pass
04/14/2025 BULD - Electrical Clearance Passed 4/14/25
TEP CLEARANCE:ECO
07/11/2025 COT - RSEL - Outdoor Lighting Passed 7-11-25: approved.
07/11/2025 COT - RSME - Mechanical Final Passed 7-11-25: mechanical final approved.
07/11/2025 COT - RSPL - Plumbing Final Passed 7-11-25: plumbing final approved.
07/11/2025 COT - RSPL - Yard Water Line Passed 7-11-25: approved.
07/15/2025 ENGR Engineering Final Passed
07/15/2025 RSBU - Building Final Passed 7/15/25 corrections made
07/15/2025 RSBU - Building Progress Passed 7/15/25 corrections made
07/15/2025 COT - RSEL - Electrical Final Passed 7/15/25 corrections made

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LOT 69 SIC PT 2-2025-06-20_V2.PDF DOCUMENTS VIEW
USE - PATTISON SOILS REPORT 1.25.2022_V1.PDF DOCUMENTS VIEW
Z160 BIG BEND- TRUSS REVIEW LETTER - LAYOUT PT 2_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
PHASE 1 LOT 69 PLOT PLAN_V1.PDF DOCUMENTS VIEW
PHASE 1A LOT 69 SIC-2024-06-21_V1.PDF DOCUMENTS VIEW