Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0524-00647
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
9641 E HARKES DR
Address NEW:
9641 E HARKES DR
Apply Date:
05/28/2024
Applicant:
Brianna Quiroz
Description:
Big Bend Model Plan La Escalera
Permit Reviews
Permit Number - TC-MDP-0524-00647
Permit Status: Complete
Permit Description: Big Bend Model Plan La Escalera
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/30/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 05/30/2024 | REQUIRES RESUBMIT |
| 03/28/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 03/28/2025 | APPROVED |
| 05/31/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.2 | 06/03/2024 | APPROVED |
| 03/28/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/28/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-0524-00647
Permit Status: Complete
Permit Description: Big Bend Model Plan La Escalera
| Date | Description | Comments |
|---|---|---|
| 06/03/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 05/31/2024 | Post-Installed Anchor Inspection Report is required. | |
| 05/31/2024 | Post-Tension Inspection Report is required. | |
| 05/24/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 05/24/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 05/31/2024 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0524-00647
Permite Description: Big Bend Model Plan La Escalera
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/29/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | 11-29-24, not applicable. |
| 11/29/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | 11-29-24, not applicable. |
| 09/18/2024 | COT - RSBU - Roof Nailing | N/A | Re-inspection required | Loose panels |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0524-00647
Permit Description: Big Bend Model Plan La Escalera
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/15/2024 | COT - RSPL - Backwater Valve | Passed | ||
| 08/15/2024 | COT - RSPL - Rough Soil | Passed | ||
| 08/15/2024 | COT - RSPL - Sewer | Passed | ||
| 08/15/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 08/27/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 08/27/2024 | COT - RSBU - Preslab | Passed | ||
| 08/27/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 08/27/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 09/18/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 9/18/24: missing nailing at bottom plate second floor shear wall 8 will check at intermediate | |
| 12/05/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 12-5-24, residential intermediate inspection approved. Okay to continue with construction. | |
| 01/03/2025 | COT - RSBU - Interior Shear Bracing | Passed | Passed 1/3/25 ok to tape | |
| 02/20/2025 | BULD - Electrical Clearance | Passed | 2/19/25 approval for TEP ECO | |
| 03/24/2025 | COT - RSBU - Roof Nailing | Passed | Corrected by intermediate stage | |
| 03/24/2025 | COT - RSEL - Electrical Final | Passed | Passed 3/24/25 | |
| 03/24/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed 3/24/25 | |
| 03/24/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 03/24/2025 | RSBU - Building Progress | Passed | Passed 3/24/25 | |
| 03/26/2025 | COT - RSME - Mechanical Final | Passed | 26 March 25 Pass |
|
| 03/26/2025 | ENGR Engineering Final | Passed | CO Ready | |
| 03/26/2025 | RSBU - Building Final | Passed | 26 March 25 Pass |