Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
06/21/2024
Applicant:
Description:
SFR RKF55I T21-M0086

Permit Reviews

Permit Number - TC-MDP-0524-00633
Permit Status: Inspections complete
Permit Description: SFR RKF55I T21-M0086
Start Date Submittal Complete Date Status  
06/21/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 06/24/2024 APPROVED Review Details
06/25/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/27/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0524-00633
Permit Status: Inspections complete
Permit Description: SFR RKF55I T21-M0086
Total Outstanding Activity Conditions - 6
Date Name
05/17/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
06/24/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
06/24/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/24/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/24/2024 Post-Tension Inspection Report is required.
06/24/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Conditions

Permit Number - TC-MDP-0524-00633
Permit Status: Inspections complete
Permit Description: SFR RKF55I T21-M0086
Date Description Comments
05/17/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/24/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00633
Permite Description: SFR RKF55I T21-M0086
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
08/12/2024 COT - RSPL - Yard Water Line N/A Re-inspection required 8/12/24: Blue tracer wire missing on water line.
10/29/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required Missing fire foam double top plate in garage near water heater, properly seal off staples to vapor barrier in great room.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00633
Permit Description: SFR RKF55I T21-M0086
Total Completed Inspections - 22
Date Description Inspector Results Comments
08/02/2024 COT - RSPL - Backwater Valve Passed Underground plumbing is connected to main sewer line with green tracer wire from clean out to sewer connection. Underground plumbing is under a 10' static water test. Backwater valve is installed between clean outs. Okay to shade pipe and backfill trenches.
08/02/2024 COT - RSPL - Rough Soil Passed Underground plumbing is connected to main sewer line with green tracer wire from clean out to sewer connection. Underground plumbing is under a 10' static water test. Backwater valve is installed between clean outs. Okay to shade pipe and backfill trenches.
08/02/2024 COT - RSPL - Sewer Passed Underground plumbing is connected to main sewer line with green tracer wire from clean out to sewer connection. Underground plumbing is under a 10' static water test. Backwater valve is installed between clean outs. Okay to shade pipe and backfill trenches.
08/13/2024 COT - RSPL - Yard Water Line Passed Okay to backfill. Shading required. 8/13/2024
08/15/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
08/15/2024 COT - RSBU - Preslab Passed
08/15/2024 COT - RSEL - Electrical Underground Passed
08/15/2024 COT - RSEL - Grounding/Bonding Passed
09/11/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Okay to proceed with rough-in of mechanical, electrical, and plumbing.
09/11/2024 COT - RSBU - Roof Nailing Passed Okay to proceed with rough-in of mechanical, electrical, and plumbing.
10/29/2024 BULD - Electrical Clearance Passed 10-29-24, panel okay to be energized.
10/29/2024 COT - RSPL - Gas Pressure Test Passed 10-29-24, pressure test approved.
10/30/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 10/30/24: All penetrations are foamed, vapor barrier in great room are sealed. M, P, AND E are complete. Okay to proceed with insulation and drywall installation.
11/15/2024 COT - RSBU - Interior Shear Bracing Passed 11-15-24, interior shear bracing verified as per approved plans. Okay to tape and texture drywall.
01/10/2025 COT - BULD - SWG Clearance Passed 1/10/25 passed CLEARANCE SWG
01/22/2025 COT - RSEL - Outdoor Lighting Passed 1/22/25 pass
01/22/2025 COT - RSPL - Plumbing Final Passed 1/22/25 pass
01/22/2025 RSBU - Building Progress Passed
01/29/2025 COT - RSEL - Electrical Final Passed 1/29/25 pass
01/29/2025 COT - RSME - Mechanical Final Passed 1/29/25 pass
01/29/2025 RSBU - Building Final Passed 1/29/25 pass
02/19/2025 ENGR Engineering Final Passed CO Ready

Documents

File Name Document Type  
F55I APPROVED TRUSS CALCS 7-29-22 - ALLIANCE TRUSS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2024-06-21_V1.PDF DOCUMENTS VIEW