Inspection Status: Passed
Inspection History: COT - RSPL - Rough SoilÂ
| Date |
Description |
Inspector |
Results |
Comments |
| 08/02/2024 |
COT - RSPL - Rough Soil |
|
Passed |
Underground plumbing is connected to main sewer line with green tracer wire from clean out to sewer connection. Underground plumbing is under a 10' static water test. Backwater valve is installed between clean outs. Okay to shade pipe and backfill trenches. |