Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
6009 S FONTANA AV
Apply Date:
05/13/2024
Applicant:
Ramon VALDEZ
Description:
DUPLEX DUPLVAL82 T22-M0037

Permit Reviews

Permit Number - TC-MDP-0524-00623
Permit Status: Complete
Permit Description: DUPLEX DUPLVAL82 T22-M0037
Start Date Submittal Complete Date Status  
08/21/2024 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 09/11/2024 REQUIRES RESUBMIT Review Details
10/14/2024 RESTAMP - RESIDENTIAL v.1 10/15/2024 APPROVED Review Details
10/04/2024 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.3 10/14/2024 APPROVED Review Details
09/16/2024 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 10/04/2024 IN REVIEW Review Details

Conditions

Permit Number - TC-MDP-0524-00623
Permit Status: Complete
Permit Description: DUPLEX DUPLVAL82 T22-M0037
Date Description Comments
05/13/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
09/03/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0524-00623
Permite Description: DUPLEX DUPLVAL82 T22-M0037
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
01/07/2025 COT - RSME - Mechanical Final N/A Re-inspection required 1-7-25, paint/coat all exterior plastic to include cpvc/pvc, thermostats shall be placed no higher than 48 o.c., and provide ladder for attic access.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0524-00623
Permit Description: DUPLEX DUPLVAL82 T22-M0037
Total Completed Inspections - 18
Date Description Inspector Results Comments
10/17/2024 COT - RSPL - Yard Water Line Passed Okay to backfill. Shading required. 10/17/2024
10/17/2024 COT - RSPL - Rough Soil Passed Okay to backfill. Shading required. 10/17/2024
10/22/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
10/22/2024 COT - RSBU - Preslab Passed
10/22/2024 COT - RSEL - Grounding/Bonding Passed
11/04/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 11-4-24, exterior clips/sheathing and roof nailing for unit #1 verified as per approved plans. Okay to continue construction.
11/04/2024 COT - RSBU - Interior Shear Bracing Passed 11-4-24, fire wall spacing verified 24" on center". Okay to install drywall as stated per approved plans.
11/04/2024 COT - RSBU - Roof Nailing Passed 11-4-24, exterior clips/sheathing and roof nailing for unit #1 verified as per approved plans. Okay to continue construction.
11/07/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO. UNITS #1 AND #2. 11/7/2024
11/07/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
11/15/2024 COT - RSPL - Sewer Passed Ok to cover progress area.
01/07/2025 COT - RSEL - Electrical Final Passed 1-7-25, electrical final approved.
01/07/2025 COT - RSEL - Outdoor Lighting Passed 1-7-25, outdoor lighting approved.
01/07/2025 COT - RSPL - Plumbing Final Passed 1-7-25, plumbing final approved
01/08/2025 ENGR Engineering Final Passed CO Ready
01/07/2025 RSBU - Building Final Passed 1-7-25, building final approved
01/07/2025 RSBU - Building Progress Passed
01/08/2025 COT - RSME - Mechanical Final Passed 1-8-25, mechanical final approved

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-FONTANA DP_V2.PDF DOCUMENTS VIEW