Permit: TC-MDP-0524-00617
Permit Details
Apply Date:
05/13/2024
Applicant:
Daria Hopkins
Description:
SFR MER1402190 T21-M0078
Permit Reviews
Permit Number - TC-MDP-0524-00617
Permit Status: Inspections
Permit Description: SFR MER1402190 T21-M0078
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/01/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/07/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0524-00617
Permit Status: Inspections
Permit Description: SFR MER1402190 T21-M0078
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
05/13/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
08/07/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
08/07/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
08/07/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
08/07/2024 | Post-Tension Inspection Report is required. |
Conditions
Permit Number - TC-MDP-0524-00617
Permit Status: Inspections
Permit Description: SFR MER1402190 T21-M0078
Date | Description | Comments |
---|---|---|
05/13/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
08/07/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0524-00617
Permit Description: SFR MER1402190 T21-M0078
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/18/2024 | COT - RSPL - Yard Water Line | Passed | 11-18-24, underground plumbing, sewer connection, and main water line verified as per approved plans. Okay to backfill-provide shading. | |
11/18/2024 | COT - RSPL - Sewer | Passed | 11-18-24, underground plumbing, sewer connection, and main water line verified as per approved plans. Okay to backfill-provide shading. | |
11/18/2024 | COT - RSPL - Rough Soil | Passed | 11-18-24, underground plumbing, sewer connection, and main water line verified as per approved plans. Okay to backfill-provide shading. |