Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0524-00579
Permit Details
Apply Date:
05/01/2024
Applicant:
Ramon VALDEZ
Description:
DUPLEX DUPLVAL82 T22-M0037
Permit Reviews
Permit Number - TC-MDP-0524-00579
Permit Status: Complete
Permit Description: DUPLEX DUPLVAL82 T22-M0037
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/08/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.3 | 07/18/2024 | APPROVED |
05/15/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 05/31/2024 | REQUIRES RESUBMIT |
06/20/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 | 07/02/2024 | REQUIRES RESUBMIT |
07/18/2024 | RESTAMP - RESIDENTIAL v.1 | 07/23/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0524-00579
Permit Status: Complete
Permit Description: DUPLEX DUPLVAL82 T22-M0037
Date | Description | Comments |
---|---|---|
05/01/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
05/21/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0524-00579
Permite Description: DUPLEX DUPLVAL82 T22-M0037
Total Outstanding Inspections - 5
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/28/2024 | COT - RSBU - Interior Shear Bracing | N/A | Not Applicable | 10/28/24 see previous notes |
10/28/2024 | COT - RSEL - Electrical Underground | N/A | Not Applicable | |
10/28/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
10/28/2024 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 10/28/24 see previous notes |
10/28/2024 | RSBU - Building Final | N/A | Re-inspection required | 10/28/24 see previous notes |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0524-00579
Permit Description: DUPLEX DUPLVAL82 T22-M0037
Total Completed Inspections - 17
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/29/2024 | COT - RSPL - Rough Soil | Passed | ||
08/02/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
08/02/2024 | COT - RSBU - Preslab | Passed | ||
08/02/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
09/09/2024 | COT - RSBU - Roof Nailing | Passed | ||
09/11/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
09/11/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
09/25/2024 | COT - RSPL - Yard Water Line | Passed | ||
10/25/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
10/25/2024 | COT - RSEL - Electrical Final | Passed | ||
10/25/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
10/25/2024 | COT - RSME - Mechanical Final | Passed | ||
10/25/2024 | COT - RSPL - Sewer | Passed | ||
10/25/2024 | ENGR Engineering Final | Passed | CO Ready | |
10/25/2024 | RSBU - Building Progress | Passed | ||
10/29/2024 | COT - RSPL - Plumbing Final | Passed | ||
10/29/2024 | RSBU - Building Final | Passed |