Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
10633 E ROSY MARBLE DR
Apply Date:
05/01/2024
Applicant:
Dana Petty
Description:
SFR MER1502320 T21-M0070 REV1 roof covering change

Permit Reviews

Permit Number - TC-MDP-0524-00553
Permit Status: Complete
Permit Description: SFR MER1502320 T21-M0070 REV1 roof covering change
Start Date Submittal Complete Date Status  
02/21/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/25/2025 APPROVED Review Details
11/07/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/07/2024 APPROVED Review Details
05/02/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 05/09/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0524-00553
Permit Status: Complete
Permit Description: SFR MER1502320 T21-M0070 REV1 roof covering change
Date Description Comments
05/03/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
05/03/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
05/03/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/03/2024 Post-Tension Inspection Report is required.
05/01/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
05/01/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
05/03/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0524-00553
Permite Description: SFR MER1502320 T21-M0070 REV1 roof covering change
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
09/06/2024 COT - RSPL - Backwater Valve N/A Not Applicable Not Applicable--No backwater valve shown on civil plan. Okay to proceed.
10/07/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Re-inspection required 10/4/24: no plans in house. Roof needs to be checked throughout several panels loose.
10/07/2024 COT - RSBU - Roof Nailing N/A Re-inspection required 10/4/24: no plans in house. Roof needs to be checked throughout several panels loose.
11/13/2024 BULD - Electrical Clearance N/A Re-inspection required Missing address label
11/13/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required 11/13/24. FAIL. Improper blocking at four gang light switch. Use a 2 x 6 on its side. Missing light switch or receptacle at primary bathroom. Missing H2 five clips at Bering wall between bedroom and dining room. Another failed inspection will result in a reinspection fee.
12/03/2024 COT - RSBU - Interior Shear Bracing N/A Not Ready G2 wall needs 4" blocking on edges, 3/8" from seams throughout, bedroom 3 closet panel has only 2 screws, falling off wall. Reinspect required 12/3/24
11/13/2024 RSBU - Building Progress N/A Re-inspection required 11/13/24. FAIL. Improper blocking at four gang light switch. Use a 2 x 6 on its side. Missing light switch or receptacle at primary bathroom. Missing H2 five clips at Bering wall between bedroom and dining room. Another failed inspection will result in a reinspection fee.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0524-00553
Permit Description: SFR MER1502320 T21-M0070 REV1 roof covering change
Total Completed Inspections - 21
Date Description Inspector Results Comments
09/05/2024 COT - RSPL - Yard Water Line Passed
09/05/2024 COT - RSPL - Sewer Passed
09/05/2024 COT - RSPL - Rough Soil Passed
09/13/2024 COT - RSEL - Electrical Underground Passed
09/13/2024 COT - RSEL - Grounding/Bonding Passed
09/16/2024 COT - RSBU - Preslab Passed
09/16/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
10/08/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
10/08/2024 COT - RSBU - Roof Nailing Passed
11/12/2024 COT - RSPL - Gas Pressure Test Passed 11-12-24, gas pressure test verified at 15psi.
11/15/2024 BULD - Electrical Clearance Passed 11-15-24, panel approved to be energized.
11/15/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 11-15-24, items from previous inspection have been corrected.
12/05/2024 COT - RSBU - Interior Shear Bracing Passed Corrections were made. 12/5/2024
01/31/2025 COT - BULD - SWG Clearance Passed 1-31-25, approved-okay for Southwest gas to install meter. Clearance sent.
02/12/2025 RSBU - Building Progress Passed Construction is complete per plans. All mechanical, electrical, and plumbing fixtures are installed and fully operational. Smoke detectors are installed and tied together. Okay to issue Certificate of Occupancy.
02/12/2025 COT - RSEL - Electrical Final Passed Construction is complete per plans. All mechanical, electrical, and plumbing fixtures are installed and fully operational. Smoke detectors are installed and tied together. Okay to issue Certificate of Occupancy.
02/12/2025 COT - RSEL - Outdoor Lighting Passed Construction is complete per plans. All mechanical, electrical, and plumbing fixtures are installed and fully operational. Smoke detectors are installed and tied together. Okay to issue Certificate of Occupancy.
02/12/2025 COT - RSME - Mechanical Final Passed Construction is complete per plans. All mechanical, electrical, and plumbing fixtures are installed and fully operational. Smoke detectors are installed and tied together. Okay to issue Certificate of Occupancy.
02/12/2025 COT - RSPL - Plumbing Final Passed Construction is complete per plans. All mechanical, electrical, and plumbing fixtures are installed and fully operational. Smoke detectors are installed and tied together. Okay to issue Certificate of Occupancy.
02/12/2025 ENGR Engineering Final Passed
02/12/2025 RSBU - Building Final Passed Construction is complete per plans. All mechanical, electrical, and plumbing fixtures are installed and fully operational. Smoke detectors are installed and tied together. Okay to issue Certificate of Occupancy.

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
TRUSS DESIGN DRAWINGS_V1.PDF DOCUMENTS VIEW
150166 PT LOT 82 COMPLETE-2024-11-06_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 82 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 82 SPECIAL INSPECTION CERTIFICATE-2024-05-02_V1.PDF DOCUMENTS VIEW