Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0523-01104
Permit Details
Apply Date:
05/30/2023
Applicant:
HSLCS Permits
Description:
Building B three-story, 24 unit, apartment building model plans
Permit Reviews
Permit Number - TC-MDP-0523-01104
Permit Status: Complete
Permit Description: Building B three-story, 24 unit, apartment building model plans
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/05/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/08/2024 | REQUIRES RESUBMIT |
08/12/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/14/2024 | APPROVED |
06/27/2023 | COMMERCIAL REVIEW - FULL v.1 | 07/24/2023 | APPROVED |
08/05/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 08/08/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0523-01104
Permit Status: Complete
Permit Description: Building B three-story, 24 unit, apartment building model plans
Date | Description | Comments |
---|---|---|
08/08/2024 | AIR BALANCING REPORT IS REQUIRED. | |
04/21/2023 | AIR BALANCING/COMMISSIONING REPORT IS REQUIRED. | |
04/21/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
04/21/2023 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
04/21/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
05/30/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
04/21/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
08/08/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0523-01104
Permite Description: Building B three-story, 24 unit, apartment building model plans
Total Outstanding Inspections - 4
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/14/2023 | COT - LCPL - Rough Soil | N/A | Re-inspection required | 8/14/23: leak by main drain in center of building. Repair and recall. |
12/05/2023 | COT - LCBU - Exterior Clips/Sheathing | N/A | Partial Pass | 10/27/23: level 1 framing approved, exterior clips on second floor per plan pending interior clips and framing. 12/5/23: all exterior and interior clips and shear walls per plan. |
03/01/2024 | COT - LCBU - Framing | N/A | Partial Pass | 2/14/24: first floor framing corrections need to be made regarding missing columns and blocking's above columns. Holdowns missing at interior shear walls at first floor, anchor bolts at interior shear walls missing throughout. Pending inspection on other floors. 2/15/24: second floor corrections need to be made regarding blocking above columns. 2/16/24: Third floor good to go per Ernie Stevens. Partial-pass. 3/1/24: corrections made at first and second floor. Ok to proceed with intermediates . |
09/07/2023 | COT - LCPL - Yard Water Line | N/A | Partial Pass | 9/7/23: domestic water stub in at south end of building #10 approved to cover. Air tested at 65 psi.9/7/23: rough soil for building #4 approved to cover. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0523-01104
Permit Description: Building B three-story, 24 unit, apartment building model plans
Total Completed Inspections - 30
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/17/2023 | COT - LCPL - Rough Soil | Passed | ||
09/13/2023 | COT - LCBU - Excavation/Rebar/Zoning | Passed | ||
09/13/2023 | COT - LCBU - Preslab | Passed | ||
09/13/2023 | COT - LCEL - Electrical Underground | Passed | ||
09/13/2023 | COT - LCEL - Grounding/Bonding | Passed | ||
12/28/2023 | COT - LCBU - Roof Nailing | Passed | ||
01/11/2024 | COT - LCBU - Exterior Clips/Sheathing | Passed | ||
01/29/2024 | COT - LCPL - Sewer | Passed | 1/29/24: connection made | |
03/25/2024 | COT - LCBU - Building Above Ceiling | Passed | 3/14/24: third floor intermediates passed. 3/15/24: second floor passed. 3/21/24: breezeway ok to cover 3/25/24: first floor passed ok to proceed. |
|
03/25/2024 | COT - LCBU - Framing | Passed | ||
03/25/2024 | COT - LCEL - Electrical Above Ceiling | Passed | 3/14/24: third floor intermediates passed. 3/15/24: second floor passed. 3/21/24: breezeway ok to cover 3/25/24: first floor passed ok to proceed. |
|
03/25/2024 | COT - LCEL - Electrical Intermediate | Passed | 3/14/24: third floor intermediates passed. 3/15/24: second floor passed. 3/21/24: breezeway ok to cover 3/25/24: first floor passed ok to proceed. |
|
03/25/2024 | COT - LCME - Mechanical Above Ceiling | Passed | 3/14/24: third floor intermediates passed. 3/15/24: second floor passed. 3/21/24: breezeway ok to cover 3/25/24: first floor passed ok to proceed. |
|
03/25/2024 | COT - LCME - Mechanical Intermediate | Passed | 3/14/24: third floor intermediates passed. 3/15/24: second floor passed. 3/21/24: breezeway ok to cover 3/25/24: first floor passed ok to proceed. |
|
03/25/2024 | COT - LCPL - Plumbing Above Ceiling | Passed | 3/14/24: third floor intermediates passed. 3/15/24: second floor passed. 3/21/24: breezeway ok to cover 3/25/24: first floor passed ok to proceed. |
|
03/25/2024 | COT - LCPL - Plumbing Intermediate | Passed | 3/14/24: third floor intermediates passed. 3/15/24: second floor passed. 3/21/24: breezeway ok to cover 3/25/24: first floor passed ok to proceed. |
|
04/08/2024 | COT - HCBU - Interior Shear Bracing | Passed | 4/3/24: not ready 4/8/24: passed |
|
04/23/2024 | COT - HCPL - Plumbing Roof Drains | Passed | ||
08/05/2024 | COT - LCPL - Yard Water Line | Passed | ||
05/20/2024 | BULD - Electrical Clearance | Passed | 5/20/24: ECO TEP CLEARANCE for West meter pack units (10304,10204,10203,10104,10303,House Panel, 10103,10301,10201,10101,10302,10202,10102). East meter pack units (10306,10305,10205,10105,10308,10208,10206,10106,10307,10207,10108,10107) | |
08/02/2024 | COT - BULD - SWG Clearance | Passed | ||
08/02/2024 | COT - LCPL - Gas Pressure Test | Passed | ||
08/19/2024 | COT - LCPL - Plumbing Final | Passed | ||
08/19/2024 | COT - LCME - Mechanical Final | Passed | ||
08/19/2024 | COT - LCEL - Electrical Final | Passed | ||
08/21/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
08/23/2024 | ENGR Engineering Final | Passed | All items have been fixed, Move in ready | |
08/23/2024 | COT - LCEL - Outdoor Lighting | Passed | ||
08/27/2024 | COT - LCBU - Building Final | Passed | Okay for CofO. 8/27/2024 | |
09/16/2024 | COT - FCON - Fire - Final | Passed |