Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
05/30/2023
Applicant:
Erin Dick
Description:
Building B three-story, 24 unit, apartment building model plans

Permit Reviews

Permit Number - TC-MDP-0523-01104
Permit Status: Complete
Permit Description: Building B three-story, 24 unit, apartment building model plans
Start Date Submittal Complete Date Status  
07/05/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/08/2024 REQUIRES RESUBMIT Review Details
08/12/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/14/2024 APPROVED Review Details
06/27/2023 COMMERCIAL REVIEW - FULL v.1 07/24/2023 APPROVED Review Details
08/05/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 08/08/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0523-01104
Permit Status: Complete
Permit Description: Building B three-story, 24 unit, apartment building model plans
Date Description Comments
08/08/2024 AIR BALANCING REPORT IS REQUIRED.
04/21/2023 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
04/21/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
04/21/2023 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
04/21/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/30/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
04/21/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
08/08/2024 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0523-01104
Permite Description: Building B three-story, 24 unit, apartment building model plans
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
08/14/2023 COT - LCPL - Rough Soil N/A Re-inspection required 8/14/23: leak by main drain in center of building. Repair and recall.
12/05/2023 COT - LCBU - Exterior Clips/Sheathing N/A Partial Pass 10/27/23: level 1 framing approved, exterior clips on second floor per plan pending interior clips and framing.
12/5/23: all exterior and interior clips and shear walls per plan.
03/01/2024 COT - LCBU - Framing N/A Partial Pass 2/14/24: first floor framing corrections need to be made regarding missing columns and blocking's above columns. Holdowns missing at interior shear walls at first floor, anchor bolts at interior shear walls missing throughout. Pending inspection on other floors.
2/15/24: second floor corrections need to be made regarding blocking above columns.
2/16/24: Third floor good to go per Ernie Stevens. Partial-pass.
3/1/24: corrections made at first and second floor. Ok to proceed with intermediates .
09/07/2023 COT - LCPL - Yard Water Line N/A Partial Pass 9/7/23: domestic water stub in at south end of building #10 approved to cover. Air tested at 65 psi.9/7/23: rough soil for building #4 approved to cover.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0523-01104
Permit Description: Building B three-story, 24 unit, apartment building model plans
Total Completed Inspections - 30
Date Description Inspector Results Comments
08/17/2023 COT - LCPL - Rough Soil Passed
09/13/2023 COT - LCBU - Excavation/Rebar/Zoning Passed
09/13/2023 COT - LCBU - Preslab Passed
09/13/2023 COT - LCEL - Electrical Underground Passed
09/13/2023 COT - LCEL - Grounding/Bonding Passed
12/28/2023 COT - LCBU - Roof Nailing Passed
01/11/2024 COT - LCBU - Exterior Clips/Sheathing Passed
01/29/2024 COT - LCPL - Sewer Passed 1/29/24: connection made
03/25/2024 COT - LCBU - Building Above Ceiling Passed 3/14/24: third floor intermediates passed.
3/15/24: second floor passed.
3/21/24: breezeway ok to cover
3/25/24: first floor passed ok to proceed.
03/25/2024 COT - LCBU - Framing Passed
03/25/2024 COT - LCEL - Electrical Above Ceiling Passed 3/14/24: third floor intermediates passed.
3/15/24: second floor passed.
3/21/24: breezeway ok to cover
3/25/24: first floor passed ok to proceed.
03/25/2024 COT - LCEL - Electrical Intermediate Passed 3/14/24: third floor intermediates passed.
3/15/24: second floor passed.
3/21/24: breezeway ok to cover
3/25/24: first floor passed ok to proceed.
03/25/2024 COT - LCME - Mechanical Above Ceiling Passed 3/14/24: third floor intermediates passed.
3/15/24: second floor passed.
3/21/24: breezeway ok to cover
3/25/24: first floor passed ok to proceed.
03/25/2024 COT - LCME - Mechanical Intermediate Passed 3/14/24: third floor intermediates passed.
3/15/24: second floor passed.
3/21/24: breezeway ok to cover
3/25/24: first floor passed ok to proceed.
03/25/2024 COT - LCPL - Plumbing Above Ceiling Passed 3/14/24: third floor intermediates passed.
3/15/24: second floor passed.
3/21/24: breezeway ok to cover
3/25/24: first floor passed ok to proceed.
03/25/2024 COT - LCPL - Plumbing Intermediate Passed 3/14/24: third floor intermediates passed.
3/15/24: second floor passed.
3/21/24: breezeway ok to cover
3/25/24: first floor passed ok to proceed.
04/08/2024 COT - HCBU - Interior Shear Bracing Passed 4/3/24: not ready
4/8/24: passed
04/23/2024 COT - HCPL - Plumbing Roof Drains Passed
08/05/2024 COT - LCPL - Yard Water Line Passed
05/20/2024 BULD - Electrical Clearance Passed 5/20/24: ECO TEP CLEARANCE for West meter pack units (10304,10204,10203,10104,10303,House Panel, 10103,10301,10201,10101,10302,10202,10102). East meter pack units (10306,10305,10205,10105,10308,10208,10206,10106,10307,10207,10108,10107)
08/02/2024 COT - BULD - SWG Clearance Passed
08/02/2024 COT - LCPL - Gas Pressure Test Passed
08/19/2024 COT - LCPL - Plumbing Final Passed
08/19/2024 COT - LCME - Mechanical Final Passed
08/19/2024 COT - LCEL - Electrical Final Passed
08/21/2024 TRSP - ROW - Final/Close-Out Passed
08/23/2024 ENGR Engineering Final Passed All items have been fixed, Move in ready
08/23/2024 COT - LCEL - Outdoor Lighting Passed
08/27/2024 COT - LCBU - Building Final Passed Okay for CofO. 8/27/2024
09/16/2024 COT - FCON - Fire - Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
EES_240809_WATER_CHLORINIZATION_AIR_BALANCE_COMBINED-2024-08-09_V1.PDF DOCUMENTS VIEW
EES_240805_SIC_FINAL_BLDG10_COMBINED-2024-08-05_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
EES_210223_GEOTECH_REPORT_V1.PDF DOCUMENTS VIEW
EES_230530_BUILDING_10_SPECIAL INSPECTION CERT-2023-06-16_V1.PDF DOCUMENTS VIEW
EES_230616_ SITE PLANS (BLDG 10)_V1.PDF DOCUMENTS VIEW